Browse
Search
Agenda - 01-07-1985
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1985
>
Agenda - 01-07-1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 11:36:50 AM
Creation date
9/8/2016 11:22:58 AM
Metadata
Fields
Template:
BOCC
Date
1/7/1985
Meeting Type
Public Hearing
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAJOR SUBDIVISION CHECKLIST <br /> NAME OF SUBDIVISION Property of C. Norman Walker & Peggy Walker OWNER OR DEVELOPER Norman Walker � <br /> ADDRESS Rt. Z Rou emont N. C. 27572 <br /> TOWNSHIP Little River TAX MAP 16 BLOCK LOT 2 <br /> NAME Or SURVEYOR OR•ENGINEER Alois Callem n <br /> Total number-of lots 3 To be developed in 1 phase(s) , Total number'of acres 9.97 ^ <br /> Typical dwelling units at present none or proposed <br /> WATER SUPPLY: Public (Name) Commnuity Individual X <br /> SEWAGE TREATMENT: Public Community Individual Septic tank X <br /> SCHOOL DISTRICT Oranoe o'un y FIRE DISTRICT � i}}le River <br /> Access onto State Road #1508 &15,f9ad Standard. Public_ X or Private Class A B <br /> Existing critical areas such as streams C <br /> Explain: { X) , Flood prone areas ( ) , Watershed •{ }, Historic Sites <br /> ( } , Other <br /> See plat <br /> ( ) <br /> Land uses in the general area w Ilinas. farming <br /> SKETCH PLAN RECEIVED (Date) 21/12/84 Approved ( X ) Recommended Changes { ). <br /> PRELIMINARY PLAN RECEIVED (Date) /19/84 REVISED PRELIMINARY PLAN RECEIVED (Date) <br /> Preliminary Review by Health Department 11/3x/84 Erosion Control Officer-HO—Ear wF _ <br /> Board of Education 11/20/84 Department of Transportation <br /> Other OWASA (if possible) <br /> -Mebane (if possible) <br /> Hillsborough (if possible) <br /> -Orange/Alamasce (if possible) <br /> Preliminary Action by the Planning Board Recommended a roval 12/17/84 <br /> Preliminary Action by the County Commissioners <br /> FINAL PLAT RECEIVED (Date) <br /> { ) All lots were approved by the Health Department <br /> { } Lots failing Health Departments approval are combined or listed properly on the plat <br /> ( ) Road Maintenance Agreement submitted (where applicable) . Approved <br /> { } Improvements have been provided for; completed; bond, letter of credit, cash. Date <br /> { ) Final OWASA approval (where applicable) on all plans & specifications, Date <br /> ( ) Final DOT approval on plat <br /> { } <br /> Final ,action by the Planning Hoard <br />
The URL can be used to link to this page
Your browser does not support the video tag.