Browse
Search
2016-509-E AMS - Muter Construction for canopy modifications
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-509-E AMS - Muter Construction for canopy modifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2016 8:57:22 AM
Creation date
9/8/2016 8:53:23 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$5,503.93
Document Relationships
R 2016-509-E AMS - Muter Construction for canopy modifications
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2B4514AD-1 E9B-4DC5-B1AD-F2D340A0BB77 <br /> MUTER• <br /> CONSTRUCTION PROPOSAL FORM <br /> Project: Cedar Grove Canopy Proposal#: <br /> Contract: Project#: <br /> Contractor: Muter Construction,LLC Contractor#: <br /> Description of change: <br /> Canopy Modifications <br /> Materials (Attach list with Qty,Item,Unit$,Unit mh,Total mh,OT mh,Total$) SUBTOTALS <br /> 1 Total Direct Cost of Materials $2,465.00 <br /> 2 Sales Tax $166.39 <br /> / / 3 <br /> 3 Shipping&Transportation $150.00 <br /> 4 Overhead&Profit on Materials 15% $417.21 $3,198.60 <br /> Labor <br /> 5 Total Manhours: 64 MB @ $25.00 /hr, $1,600.00 <br /> 6 Payroll Taxes&Insurance 35.0% $560.00 <br /> 7 Overhead&Profit on Labor 15% $324.00 $2,484.00 <br /> Equipment Rental <br /> 8 Permit $100.00 <br /> 9 Overhead&Profit on Equipment 15.00% $15.00 $115.00 <br /> Subcontractors ] <br /> 10 Subcontractors ($375.00) <br /> 11 Overhead&Profit on Subcontractors $0.00 ($375.00) <br /> Subtotal of Proposal $5,422.60 <br /> 12 Insurances 1.5% $81.34 <br /> TOTAL OF PROPOSAL $5,503.93 <br /> Contractor's Signature: Date: <br /> Approval Recommended by Design Consultant: Date: <br /> Owner's Representative Approval: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.