Browse
Search
2016-504-E AMS - Tibbens Construction for CGCC upgrade window
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-504-E AMS - Tibbens Construction for CGCC upgrade window
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 3:46:07 PM
Creation date
9/6/2016 3:45:44 PM
Metadata
Fields
Template:
BOCC
Date
9/6/2016
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Director signed
Amount
$790.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E8CB95E7-533C-49AF-92F5-8C9FC602256D <br /> Proposal <br /> FROM: Tibbens Construction Page. No. 1 of 1 <br /> 849 Moose Tracks Trl .Cedar Grove NC. <br /> 27231 919-643-2856 C#919-667-5366 <br /> PROPOSAL SUBMITTED TO: Orange County NC <br /> Name: Parks and recreations <br /> Phone: <br /> Street: Hwy 86 North <br /> City: Cedar grove <br /> State: NC 27231 <br /> Remove and cut 6" from height of existing fixed window as described at site visit and reinstall <br /> with a 7"x 5' shelf to create a pass thru window. $560.00 <br /> We will make every effort to remove the existing window without breaking it. If window breaks <br /> there will be an additional charge for new glass. $230.00 <br /> All of the work is to be completed in a substantial and workman like manner for the sum of ($). <br /> Payment to be made each week as the work progresses to the value of One hundred percent <br /> (100%) of all work completed. The entire amount of the contract is to be paid within 5 days after <br /> completion. <br /> Any alterations or deviation from the above specifications involving extra cost of material or <br /> labor will be executed upon written order for same, and will become an extra charge over the <br /> sum mentioned in this contract. All agreements must be made in writing. <br /> Authorized Signature Mark Tibbens <br /> ACCEPTANCE <br /> www.socrates.com Page 1 of 2 SS4301-340•Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.