Orange County NC Website
Article 5: <br /> Section 5.14: Standards For Manufacturing,Assembly&Processing <br /> from the property line. <br /> (3) Hours of operation shall be limited to the hours between 7 a.m. and 7 p. . <br /> (4) Site shall have direct access to a major road, as classified in the Ora .e County <br /> Comprehensive Plan, and shall use said road as the primary acces-, unless <br /> approved otherwise in the permit. <br /> 5.14.4 Winery, pros • ction only <br /> (A) Standar• , for Class B Special Use Permit or ASE-CZ Zonin• 'istrict <br /> (1) If located in an AR or RB zoning district, the winery ' st be located on a bona <br /> fide far '. <br /> (a) A •nery, production only, that is locate on a bona fide farm, and which <br /> utiliz- primarily crops produced on .ite is considered a bona fide <br /> farming se and is not subject to ening regulations. <br /> (b) A winery, p eduction only, tha does not utilize primarily crops produced <br /> on-site, regare ess of whet -r it is located on a bona fide farm, is not <br /> considered a b..a fide f. ing use and is subject to the regulations <br /> contained in this • din ce. <br /> (2) If located adjacent to resid: t :11y zoned property, all buildings shall be located a <br /> minimum of 100 feet fro ► the pre serty line. <br /> (3) Application materials : all include a omprehensive groundwater study, for <br /> facilities expected . use more groune■ ater on an annual basis than an average <br /> single family res..ence (which uses 240 .-lions of water per day) built at the <br /> highest densi the existing zoning district ,.uld allow. For example, if the <br /> existing zo g district allows a residential de ity of 1 unit for 2 acres and the <br /> propose. se is on a six acre parcel (which cou • yield 3 residences), the <br /> propos-d use(s) may use three times the water u d by an average single family <br /> resie -nce (or 720 gallons per day, on an annualized oasis) before a <br /> co prehensive groundwater study is required. The wa :r usage rates of any <br /> •xisting use subject to zoning regulations located on the -.me lot shall be taken <br /> into account when determining if a comprehensive ground :ter study is required. <br /> Said study shall detail: <br /> (a) The amount of water anticipated to be used on a daily, w--kly, monthly, <br /> and annual basis by regulated uses located on the parcel (e.g., water <br /> usage by bona fide farm uses is not required to be included); <br /> (b) An analysis of the amount of groundwater withdrawal considered be <br /> safe and sustainable in the immediate vicinity; and <br /> (c) An analysis of whether other wells in the vicinity of the proposed use ar- <br /> expected to be affected by withdrawals made by the proposed use. <br /> 5.14.5 Industrial, Light <br /> (A) Standards for the O/RM Zoning District <br /> (1) The following Multiple Uses are permitted in the O/RM zoning district when the <br /> Principal Use type is Industrial, Light and adhere to the standards of Section <br /> 5.14.5(A)(2): <br /> (a) Banks & Financial Institutions <br /> (b) Beauty& Barber Shops <br /> (c) Laundry& Dry Cleaning Services <br /> (d) Nightclubs, Bars, Pubs <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-132 <br />