Browse
Search
Agenda - 03-13-2007-10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 03-13-2007
>
Agenda - 03-13-2007-10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:47:15 PM
Creation date
8/28/2008 11:22:17 AM
Metadata
Fields
Template:
BOCC
Date
3/13/2007
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 20070313
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />C. Questions <br />All questions regarding the RFQ must be in writing and be received by the <br />Planning Department no later than noon on Friday, March 16, 2007. <br />Questions must be addressed to Tom Altieri, AICP, Comprehensive <br />Planning Supervisor c/o Planning and Inspections Department, P.O. <br />Box 8181, Hillsborough, North Carolina 27278; fax, at 919-644-3002; or <br />via a-mail, at taltieri(a~co.oran_ge.nc.us <br />II. Background <br />Orange County is seeking a professional consultant to "synthesize" the <br />existing county reports and studies that have been completed by various <br />county departments, advisory boards, and in some cases consultants; to <br />identify any missing components typically included in a Comprehensive Plan; <br />and repackage into a Draft Comprehensive Plan (See Section III, Scope of <br />Services for additional detail). This process will be an update to an existing <br />Plan that was completed in 1981 with a revised format. <br />The overall Comprehensive Plan Update process is currently underway and is <br />being completed in two phases. Phase I, which primarily involves <br />development of Goals and a County Profile (Data) Element, is being <br />completed by County staff and advisory boards. Phase II, which primarily <br />involves the synthesis of existing reports and studies into seven (7) additional <br />Elements, may be completed by a consultant in partnership with County staff <br />and advisory boards. Although Phase II is scheduled to take place between <br />October 2007 and August 2008, parts A and B as provided in Section III <br />below could be initiated as soon as a consultant contract is executed. <br />The following documents, several of which are referenced herein, are <br />available on the Comprehensive Plan Update website at <br />http~//www.co.orange.nc.us/planning/compre cpupdate.asp: <br />Introductory Brochure <br />Draft Table of Contents <br />Draft Pu~ose and Scop e <br />Opportunities for Citizen Knowledge <br />Comprehensive Plan Up date Timetable <br />Comprehensive Plan Up date BOCC Approved Roles <br />Comprehensive Plan Up date BOCC Approved Process <br />Comprehensive Plan Up date -Key Terms <br />1981 Land Use Element Comprehensive Plan <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.