33 <br /> 44 <br /> � I <br /> (iv) Once the Infrastructure is removed from the property,owner shall obtain the necessary <br /> Erosion Control permits to re-stabilize the property. The time frame for completion shall be <br /> determined by the Orange County Erosion Control Officer. Agreed. <br /> (v)Upon removal of the facility,the Department shall cause a notice to be recorded within <br /> the Orange County Registrar of Deeds office Indicating the Class A Special Use Permit has been <br /> revoked. Agreed. <br /> ill. Anticipated Development Schedule for Completion of the Project <br /> Construction Is expected to begin within 4 months of receipt of the Interconnection Agreement and <br /> associated Power Purchase Agreement from Duke Energy. Construction is expected to take around 4 <br /> months. The site is expected to be operational before the end of 2017, <br />