Browse
Search
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 09-12-2016 - Quarterly Public Hearing
>
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:42:53 PM
Creation date
9/2/2016 11:37:14 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2016
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 09-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
228 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Planning Board/ BOCC <br /> Staff FINDINGS <br /> Recommendation <br /> STANDARDS for Solar Array—Public Utility <br /> Site Plan 5.9.6(C) Application, Applicant Testimony, Yes <br /> A site plan prepared in accordance (1)(a) Staff Testimony, and Site Plan. <br /> with Section 2.5 of and 5.9.6 (C) (1) through (d) <br /> inclusive of UDO Site plan provides elevations for <br /> proposed arrays, fencing and <br /> landscaping. <br /> The application, EA and Phase I <br /> Environmental contain required <br /> soils information and reports <br /> (Attachment 1) <br /> Standards of Evaluation <br /> 5.9.6(C) Application, Applicant Testimony, Yes <br /> On-site utility and transmission lines (2)(a) Staff Testimony, and Site Plan <br /> placed underground when feasible (Attachments 1 and 2). <br /> 5.9.6(C) Application, Applicant Testimony, Yes <br /> Height of array shall not exceed 40 (2)(b) Staff Testimony, and Site Plan <br /> ft. (Attachments 1 and 2). <br /> 5.9.6(C) Application, Applicant Testimony, Yes <br /> Individual arrays shall be designed (2)(c) Staff Testimony, and Site Plan <br /> and located to prevent reflective (Attachments 1 and 2). <br /> glare toward inhabited buildings on <br /> adjacent property and rights-of-way. <br /> Warning signs concerning voltage. 5.9.6(C) Application, Applicant Testimony, Yes <br /> (2)(d) Staff Testimony, and Site Plan <br /> (Attachments 1 and 2). <br /> Mechanical equipment and arrays 5.9.6(C) Application, Applicant Testimony, Yes <br /> shall be enclosed by a minimum 8 (2)(e) Staff Testimony, and Site Plan <br /> ft. high fence and screening per (Attachments 1 and 2). <br /> Section 6.8 of UDO. <br /> Proof of liability insurance— 5.9.6(C) Application and Applicant Yes <br /> minimum of$500,000.00 per (2)(f) Testimony(Attachment 1). <br /> occurrence. <br /> Type D land use buffer around 5.9.6(C) Application, Applicant Testimony, Yes <br /> perimeter of project (2)(g) Staff Testimony, and Site Plan <br /> (Attachments 1 and 2). <br /> Decommissioning of solar facility 5.9.6(C) Application, Applicant Testimony, Yes <br /> (3)(a) Staff Testimony, and Site Plan <br /> through (f) (Attachments 1 and 2). <br /> inclusive <br /> Applicant acknowledges <br /> requirement and agreed to the <br /> condition in the event the use of <br /> the site as a solar array— public <br /> utility is ceased. <br />
The URL can be used to link to this page
Your browser does not support the video tag.