Orange County NC Website
227 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Planning Board/ BOCC <br /> Staff FINDINGS <br /> Recommendation <br /> SPECIFIC STANDARDS <br /> Waste Disposal 5.3.2(B)(1) Staff Testimony/Attachment 4 Yes <br /> Method and adequacy of provision for Both Environmental Health and <br /> sewage disposal facilities, solid waste Solid Waste have indicated <br /> and water service. they have no concerns. As <br /> there are no structures (i.e. <br /> office) there will be no septic <br /> system on the property. <br /> Conditions are recommended <br /> to require Solid Waste Permit <br /> as part of development <br /> process. <br /> Safety 5.3.2(B)(2) Staff Testimony/Attachment 4 Yes <br /> Method and adequacy of police, fire Orange County Emergency <br /> and rescue squad protection. Service staff and the Sheriff's <br /> office have indicated the <br /> project can be served. <br /> Vehicle Access 5.3.2(B)(3) Staff Testimony/Attachment 4 Yes <br /> Method and adequacy of vehicle There will not be an <br /> access to the site and traffic appreciable traffic increase in <br /> conditions around the site. the area associated with the <br /> development of the solar array. <br /> The applicant shall be required <br /> to obtain a new driveway <br /> permit through NC DOT. <br /> The proposed access <br /> easement to US Highway 70 <br /> will be recorded prior to <br /> development. <br />