Browse
Search
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 09-12-2016 - Quarterly Public Hearing
>
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:42:53 PM
Creation date
9/2/2016 11:37:14 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2016
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 09-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
225 <br /> REQUIREMENT UDO SUPPORTING EVIDENCE Planning Board/ BOCC <br /> Staff FINDINGS <br /> Recommendation <br /> APPLICATION COMPONENTS <br /> Proper forms 2.2 Application and supporting Yes <br /> documents (Attachment 1) <br /> Fees paid 2.2.4(D) Staff Comments during August Yes <br /> 3, 2016 Planning Board <br /> Full description of use 2.7.3(B)(1) Application and supporting <br /> • Location <br /> documents (Attachment 1) Yes <br /> • Appearance <br /> • Operational characteristics <br /> Owner Information 2.7.3(B)(2) Application (Attachment 1) Yes <br /> Information Needed for Use 2.7.3(B)(3) Application and supporting <br /> Standards documents (Attachment 1) Yes <br /> Site Plans 2.7.3(B)(4) Site Plan (Attachment 2) <br /> Yes <br /> Preliminary Subdivision Plat(if 2.7.3(B)(5) No subdivision proposed: Survey N/A <br /> necessary) of access easement was <br /> provided. <br /> List of Parcels within 1,000 feet 2.7.3(B)(6) Application and supporting Yes <br /> documents (Attachment 1) <br /> Elevations of all Structures 2.7.3(B)(7) No structures (i.e. buildings)are Yes <br /> being proposed. Elevation of <br /> solar arrays and fence provided <br /> with site plan (Attachments 1 and <br /> 2) <br /> Environmental Assessment (or EIS) 2.7.3(B)(8) Application and supporting Yes <br /> • Topography documents—including EA and <br /> • Drainage issues Phase I Environmental <br /> • Natural or Cultural resources Assessment(Attachment 1) <br /> • Mining <br /> • Hazardous Wastes <br /> • Wastewater treatment <br /> • Water usage <br /> Method of Debris Disposal 2.7.3(B)(9) Application and site plan Yes <br /> (Attachments 1 and 2) <br /> Development Schedule 2.7.3(B)(10 Application—Narrative Yes <br /> (Attachment 1) <br /> Extended Vesting Request 2.7.3(B)(11 Not requested by applicant N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.