Orange County NC Website
9 <br /> CADENCE OF REVIEW: The review of a SUP is as follows: <br /> • STEP ONE — NEIGHBORHOOD INFORMATION MEETING (NIM): The first step in the <br /> review of a SUP application is a holding of a NIM to allow the applicant to meet with local <br /> property owners to review the project. <br /> STAFF COMMENT: The required NIM was held on July 27, 2015 from 5:30 p.m. <br /> to 7:30 p.m. in accordance with the UDO. Notes from this meeting are contained <br /> within Attachment 5. <br /> • STEP TWO — PLANNING BOARD REVIEW: The Planning Board reviews the request <br /> and makes a recommendation to the BOCC on the project's compliance with specific <br /> development standards (Section 5.9.6) and the general standards (Section 5.3.2 Special <br /> Uses) of the UDO. Staff prepares a script to aid the Board in making a recommendation. <br /> STAFF COMMENT: The Planning Board reviewed this item at its August 3, 2016 <br /> regular meeting and unanimously recommended approval. Please refer to <br /> Attachment 6 for a copy of the minutes from this meeting. <br /> Attachment 8 contains the findings of fact for the project as recommended by the <br /> Planning Board and staff. <br /> • STEP THREE — PUBLIC HEARING: The BOCC holds a public hearing to allow the <br /> applicant and other interested parties to provide sworn testimony related to the proposal. <br /> STAFF COMMENT: The required public hearing will be held at the September 12, <br /> 2016 Quarterly Public Hearing. <br /> Please refer to Attachment 7 for a copy of the public hearing notice. <br /> • STEP FOUR — DECISION: The BOCC will review the Planning Board/staff <br /> recommendation as well as any other testimony/evidence presented at the hearing, <br /> deliberate, certify the record, close the public hearing, and then render a final decision. <br /> BACKGROUND (APPLICATION): The applicant is proposing to develop a solar facility on a 27.3 <br /> acre leased portion of the 52.1 acre subject property with the remaining 24.8 acres being <br /> undeveloped. Please refer to Attachment(s) 1 through 3 for additional information <br /> Proposed individual arrays shall be approximately 7-to 9-feet in height, with approximately 2-to 3-feet <br /> of ground clearance, and approximately 50-feet in length. A gated 6 foot high chain link security <br /> fence, topped with 3-feet of strand barbed wire, shall enclose the perimeter of the array to prevent <br /> access. This fenced area shall be further surrounded by a Type D 50-foot wide landscaped buffer. <br /> There shall be no business or other occupied office located on the property. Vehicular access is <br /> proposed via a 30-to 50-foot wide access easement through Orange County PIN 9835-10-3858 to <br /> an existing driveway onto US Highway 70. This parcel is also owned by the family leasing the <br /> subject areas to Oakwood Solar Farm LLC/ ESA Renewables. <br /> The site contains floodplain, numerous stream buffers and connected water body features in the <br /> northeastern and eastern portions of the subject parcel. These areas will remain undisturbed and <br /> the required 65-and 80-foot wide stream buffers along the floodplain and top of bank shall be <br /> provided. <br />