Orange County NC Website
163 <br /> 5. Revise proposed use to reflect UDO code language "Solar Array- Public Utility." <br /> 6. Recommend that you consider adding a landscape plan to better address the below <br /> comments. <br /> 7. Please consolidate the notes and clarify the Type D Land Use Buffer on the site <br /> plan. Please provide Staff with a detailed drawing/rendering of a typical 100 ft. <br /> section of the buffer. For every 100 ft. note the number of plants to be planted per <br /> the landscape requirements for the Type D Land Use Buffer. Also note that the <br /> typical section is to be applied where existing vegetation is removed or is <br /> insufficient to meet the stated Type D buffer rate. Also label areas outside the <br /> buffer that are to remain undisturbed. <br /> 8. Revise note 6 to also indicate species will be native, non-invasive and drought <br /> tolerant. <br /> 9. Provide a general list or range of proposed landscape materials and consolidate <br /> into a plant list. <br /> 10. Add notes and labels regarding existing vegetation throughout the site with species, <br /> height and caliper size (measured at DBH) ranges. <br /> 11. Indicate your limits of disturbance and tree save areas. <br /> 12. Provide a detail and/or cross section of the access easement and interior utility <br /> drives. <br /> 13. Please demarcate the floodplain with appropriate buffers on the site plan with a <br /> pattern or notation. Please do likewise with streams. <br /> 14. Provide a legend on plans to make it clearer what symbology and hatches <br /> represent. <br /> 15. There are several boxes without text and leaders to what may be the lease limits. <br /> 16. Please be advised and acknowledge on the plan that the SUP applies to the entire <br /> parcel and not just the leased area. <br /> 17. Please label and note dimensions on all driveways throughout the solar array area. <br /> 18. Record and reference the access easement on the frontage lot. <br /> 19. Indicate that access easement will be free and clear of any structures and/or <br /> obstructions. <br /> 20. Please also label and note the dimensions of the access easement leading to the <br /> site. <br /> 21. The current site plan shows that the easement leads into a driveway without <br /> change in dimension. This implies the EOP for the utility vehicles is 50' or that you <br /> have these interior drives within easements. <br /> 22. Please also reference the book and page number of the recorded easement. <br /> 23. Consider having one version of the plan with an ortho-photo and one without. This <br /> may make the plans easier to read and follow. <br /> 24. Please identify the outlined boxes (3) with lines connected from the edges of the <br /> solar array area to the boxes. <br /> 25. Please show more clearly the Parcel Identification Numbers (PINs) on the subject <br /> areas to make clear distinction between the parcel with the proposed solar arrays <br /> and the parcel from which an easement will be established. <br /> 26. Please ensure that the PIN is 9835-02-9137 (some of these numbers have been <br /> transposed so that the PIN is inaccurate in some cases) on all application materials <br /> and reference easement. <br />