Browse
Search
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 09-12-2016 - Quarterly Public Hearing
>
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:42:53 PM
Creation date
9/2/2016 11:37:14 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2016
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 09-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
152 <br /> State of North Carolina Reviewing Office:Raleigh <br /> Department of Environment and Natural Resources <br /> INTERGOVERNMENTAL REVIEW-PROJECT COMMENTS Project Number 16-0397 Due Date:7/18/2016 <br /> County ORANGE <br /> After review of this project it has been determined that the ENR permit(s)and/or approvals indicated may need to be obtained in order for this project to comply with <br /> North Carolina Law.Questions regarding these permits should be addressed to the Regional Office indicated on the reverse of the form.All applications,information <br /> and guidelines relative to these plans and permits are available from the same Regional Office, <br /> Normal Process Time <br /> PERMITS SPECIAL APPLICATION PROCEDURES or REQUIREMENTS (statutory time limit) <br /> Permit to construct&operate wastewater treatment Facilities, A lication 90 days before days sewer system extensions&sewer systems not discharging PP y begin construction technical award of construction 30 da s <br /> Imo state surface waters, contracts.On-site inspection.Post-application technical conference usual. (90 days) <br /> NPDES-permit to discharge into surface water and/or Application 180 days before begin activity.On-site inspection.Pre. <br /> 0 permit to operate and construct wastewater facilities application conference usual.Additionally,obtain permit to construct 90.120 days <br /> discharging into state surface waters. wastewater treatment facility-granted alter NPDES.Reply time 30 days after (N/A) <br /> receipt of plans or issue of NPDES permit-whichever is later. <br /> O Water Use Permit Pre-application technical conference usually necessary 30 days <br /> (N/A) <br /> 0 Well Construction Permit Complete application must be received and permit issued prior to the 7 days <br /> installation of a well. (15 days) <br /> Application copy must be served on each adjacent riparian property owner. <br /> Dredge and Fill Permit On-site inspection.Pre-application conference usual.Filling may require 55 days <br /> Easement to Fill from N.C.Department of Administration and (90 days) <br /> Federal Dredge and Fill Permit <br /> Permit to construct&operate Air Pollution Abatement Application must he submitted and permit received prior to <br /> construction and operation of the source. If a permit is required in an <br /> [� facilities and/or Emission Sources as per 15 A NCAC 90 days <br /> (2Q,0100 thru 2Q.0300) area without local zoning,then there are additional requirements and <br /> timelines(2Q.0113). <br /> ri Permit to construct&operate Transportation Facility as per Application must be submitted nt least 90 days prior to construction 90 days <br /> 15A NCAC(2D,0800,2Q,060 I or modification of the source. <br /> ® Any open burning associated with subject proposal must be <br /> in compliance with IS A NCAC 2D.1900 <br /> Demolition or renovations of structures containing asbestos <br /> rvi material must be in compliance with 15 A NCAC 20.1110 60 days <br /> (a)(1)which requires notification and removal prior to N/A (90 days) <br /> demolition.Contact Asbestos Control Group 919-707-5950. <br /> Complex Source Permit required under 15 A NCAC <br /> 21.080( <br /> The Sedimentation Pollution Control Act of 1973 must be properly addressed for any land disturbing activity.An erosion&sedimentation <br /> ❑ control plan will he required if one or more acres to be disturbed.Plan filed with proper Regional Office(Land Quality Section)At least 30 20 days <br /> days before beginning activity.A fee of$65 for the first acre or any pan of an acre. An express review option is available with additional (30 days) <br /> fees. <br /> Sedimentation and erosion control must be addressed in accordance with NCDOT's approved program. Particular attention should be given 30 days) <br /> to design and installation of appropriate perimeter sediment trapping devices as well as stable stormwater conveyances and outlets. given ( <br /> On-site inspection usual.Surety bond filed with ENR Bond amount varies <br /> Mining Permit with type ruin and number of acres of affected land.Any arc mined greater 30 days <br /> than one acre must be permitted.The appropriate bond tnust be received (60 days) <br /> before the permit can be issued. <br /> On-site inspection by N.C.Division Forest Resources if permit exceeds 4 I day <br /> C] North Carolina Burning permit days (N/A) <br /> On-site inspection by N.C.Division Forest Resources required if more than <br /> ❑ Special Ground Clearance Burning Permit -22 I day <br /> counties in coastal N.C.with organic sails five acres of ground clearing activities are involved.Inspections should be (N/A) <br /> requested at least ten days before actual bum is planned." <br /> 0 Oil Refining Facilities N/A 90.120 days <br /> (N/A) <br /> If permit required,application 60 days before begin construction.Applicant <br /> must hire N.C.qualified engineer to:prepare plans,inspect construction. <br /> certify construction is according to ENR approved plans.May also require <br /> Darn Safety Permit permit under mosquito control program.And a 404 permit(tom Corps of 30 days <br /> Engineers.An inspection of site is necessary to verify Hazard Classification. (60 days) <br /> A minimum fee of$200.00 must accompany the application.An additional <br /> processing fee based on a percentage or the total project cost will be required <br /> upon completion. <br /> Feoruaity-1440.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.