Orange County NC Website
1 <br /> 20 <br /> B. STATE PERMITS REQUIRED <br /> 1. Does the project Involve the mining of earth products? NA <br /> If-so, how many cubic feet of material are expected to be <br /> excavated? NA <br /> Has an application for a Mining Permit been submitted to <br /> NCDRCD? NA <br /> Please attach map indicating expected extent of proposed activity, <br /> 2. Does the project Involve generation or storage of hazardous or <br /> toxic wastes, as Identified by the Environmental Protection <br /> Agency? (A listing of all hazardous materials Is available from the <br /> Planning Department) <br /> Describe the wastes to be generated. No emissions or hazardous <br /> waste Is generated or emitted from the farm. <br /> How much material is expected to be generated per month? <br /> NA <br /> Will any material be treated onslte? NA <br /> Volume? NA <br /> Will any material be stored onside? NA <br /> Volume? NA <br /> Where will disposal of the material take place? <br /> NA <br /> How will materials be transported to the disposal she? <br /> NA <br /> • <br /> What measures are proposed to protect water quality and air <br /> quality In case of spills? <br /> NA <br /> 1 <br />