Browse
Search
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 09-12-2016 - Quarterly Public Hearing
>
Agenda - 09-12-2016 - C.1 - Class A Special Use Permit - Solar Array off US Highway 70 in Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:42:53 PM
Creation date
9/2/2016 11:37:14 AM
Metadata
Fields
Template:
BOCC
Date
9/12/2016
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 09-12-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
135 <br /> iley))) Hom KIMLEY-HORN AND ASSOCIATES, INC <br /> NC License#F-0102 <br /> MEMORANDUM 4�••pFs$SIo*'••,yam <br /> •r-1161uSi ed bye • <br /> 1' SE SEAL c <br /> To: Kyle Campbell, ESA Renewables �':Y' g� 1``1'�:�' <br /> From: Travis Fluitt, P.E. v ••..u.;I •� <br /> TRAVIS F��;.o•• <br /> Kimley-Horn and Associates, Inc. .`"•••••••'''• <br /> 4/26/2016 <br /> Date: April 26, 2016 <br /> Subject: Oakwood Solar Farm—Trip Generation <br /> Kimley-Horn has reviewed the trip generation potential of the proposed Oakwood solar farm located <br /> on US 70 in Mebane, NC. The ITE Trip Generation Manual does not provide trip generation rates for <br /> solar farms. Therefore, the trip generation was estimated based on the anticipated number of <br /> employees both during construction and a full build-out. <br /> During construction it is estimated that a maximum of 40 workers will be on site each day. Though <br /> some workers will carpool, as a worst case it is assumed that all workers arrive individually in the AM <br /> peak hour and depart individually in the PM peak hour. There are also anticipated to be <br /> approximately 8 truck deliveries per day during construction with only 1 vehicle on-site at any given <br /> time. As a worst case, it is assumed that 2 trucks enter and exit during each peak hour. Therefore, it <br /> is anticipated that in a worst case condition, there will be approximately 42 entering trips and 2 exiting <br /> trips in the AM peak hour and 2 entering trips and 42 exiting trips in the PM peak hour. <br /> Upon completion the site will have no full-time staff. There will be 1-2 employees that will service this <br /> site once every several months. The result is that this site is expected to generate less than 1 trip per <br /> day on average. Table 1 below summarizes the anticipated trip generation of the site. <br /> Table 1 <br /> Solar Farm Traffic Generation (Vehicles) <br /> Daily AM Peak Hour PM Peak Hour <br /> Scenario <br /> In Out In Out In Out <br /> Construction <100 <100 42 2 2 42 <br /> Build-out <1 <1 <1 <1 <1 <1 <br /> Please feel free to contact me at 919-653-2948 or travis.fluitt @kimley-horn.com with any question or <br /> comments. <br /> orve 'lr 421 Fayetteville Street, Suite 600 Raleigh, NC 27601 919-677-2000 <br /> ills oic 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.