| DCHC MPO's Prioritization 4DAssignment of Lxal Input Points forthe Division Needs Category       	Attachment 2:List of Preliminary DCHC MPO Local Input Point Assignments for Division Needs Tier Projects    							Augo 2016
<br />       															Ulvealon Needs
<br />     MC nano WCAI 			Pmiect,       	r:rcm l cress  							Quantitative(Raw)      				Methodology/Reasoning for Points Assignment'
<br />  		sjRJT to,      Mo4a.     	Routef facility Name   	T.110—stmt,     	neserlpt[ort    	tostT.MOOT   		Funding Pegiort     DIWOonlsl.    tbuntylsl ... {Gr No Points)
<br />      Input Points  			rAteg wy 		street       							$GGR
<br /> 																(OUtot 60)
<br />    										Improve existing at-grade,skewed intersection.The
<br />    										existing alignment for this intersection makes
<br />    										turning from northbound NC 751 on to O'Kelly
<br />    							SR 1731   		Chapel Road very difficult and unsafe for people who
<br />					Regional       				are not familiar with navigating the intersection.
<br /> 	100       H750227      Highway      Impact   NC 757 	O'Keliy Chapel       	Turning from westbound O'Kelly Chapel Road to   $    590,000      23.95    	E    	08     Chatham     Factors 1,2,3,5,6
<br />     							Road     		southbound NC 751 is also difficult and unsafe.Turn
<br />    										lanes and realignment of this skewed intersection
<br />    										would improve travel time for people using the turn
<br />    										lanes and would improve safety for everyone.
<br />																						Factors 1,2,3,5,6.The DCHC MPO is limited to 1800 total points.This
<br />																						project's raw score was less than 20 and is considered not as competitive as
<br />    							SR 1148(Eno    													the higher scoring projects.Therefore,DCHC MPO assigned as many points
<br />     							Mountain  		Construct new section of SR 1184(Eno Mountain 								as possible,given the limited number of points available.The DCHC MPO's
<br /> 	25       H150280      Highway    Division Needs SR 7006(Orange Grove Road)/SR  		Road)to align with SR 1192(Mayo Street)and install $   1,650,000      17.56    	D   	07     Orange     Methodology States,"Allocation of the MPO'S Local Input Points i5 based on
<br />       					Road)  	1192(Mayo 		signal.											a combination of the raw quantitative scores from NCDOT,the reviewof
<br />    							Street)														project eligibility factors,and qualitative factors that reflect established
<br />																						regional goals and objectives.The DCHC MPO's methodology is designed to
<br />    																						ze the number of projects that could be competitive for funding and
<br />																						that also meet the DCHC MPO's goals and objectives for the MPO region."
<br />    										Construct e#ension of existing roadway(Elliott Rd)								Factors 1,2,3.The DCHC MAO is limited to 1800 total points.This poject's
<br />    										on new location between Ephesus Church Rd and US 								score was less than 20 and is considered not as competitive as the
<br />    										15/501.The primary benefit of the new segment of       							higherscoring projects.Therefore,DCHC MPO assigned as many points as
<br />     							US 15/501  		road is to alleviate traffic at the intersection of US								possible,given the limited number of points available.The DCHC MPO's
<br />    										15/50&Ephesus Church Road,as well as congestion       							Methodology states,"Allocation of the MPO's Local Input Points is based on
<br /> 	25       H740638      Highway    Division Needs Elliott Rd	Blvd)am   Ephesus Church Rd    on US 15/501 between Ephesus Church and Elliott.  $   7,600,000      14.09    	D   	07     Orange      combination of the raw quantitative scores from NCDOT,the review of
<br />     							Blvd)     		The evaluation of the benefit should take into   								project eligibility factors,and qualitative factors that reflect established
<br />    										consideration the future traffic reduction and the 								regional goals and objectives.The DCHC MPO's methodology is designed to
<br />    										intersection LOS at US 15/501/Ephesus Church,and   								ze the number of projects that could be competitive for funding and
<br />    										the future LOS at the Eilimt/US 15/501 inter   								that also meet the DCHC MPO's goals and objectives for the MAO region."
<br />       					Fayetteville St Transit 			Fayetteville St Transit Corridor;Transit Corridor
<br /> 	100       T150453      Transit    Division Needs Corridor				improvements(access and stop improvements,bus $    265,000       20.74    	C   	05     Durham     Factors 1,2,3,6
<br />       					Improvements     			shelters)GoDurham5,5K,7,14;GoThangle 800,805
<br />       					Village Neighborhood 			Design and Construction of NTC:Village
<br /> 	100       T150449      Transit    Division Needs Transit Center     			Neighborhood Transit Center.GoDurham 28,3,16,  $    85,800       20.28    	C   	05     Durham     Factors 1,2,3,6
<br />     										6A,168.
<br />       					Bus Rapid Transit(BRT)			Chapel Hill Transit North South Corridor BRT Project
<br />       					System along Martin 			(formerly Alternatives Analysis)-Bus Rapid Transit
<br /> 	100       T150711      Transit    Division Needs     				along Martin Luther King Jr.Blvd and South      $  24,200,000       19.00    	D   	07     Orange     Factors 1,2,3,5,6
<br />       					anKing,Jr     			Columbia Streets,between Eubanks Park-and-Ride
<br />       					and d 1 155/501 Souuth th   			and Southern Village.
<br />													8/16/2016   [Page]of3