DCHC MPO's Prioritization TOAssignment of Local Input Points forthe Division Needs Category Attachment 2:List of Preliminary DCHC MPO Local Input Point Assignments for Division Needs Tier Projects Aug,5 2016
<br /> l#lvnalor,Needs
<br /> ocrtc nano weal "act, r ron 1 c ess Quantitative(Raw) Methodology/Reasoning for Points Assignment'
<br /> sPOT to, Mo4a. Routef facility Name T.110-stmt, neseript[ort tbstT.MOOT Funding aegiort 01"Wonlsl. tountylsl ... {Gr,No P�11tS�
<br /> mpuc Points, rAtegnwy street S�cxe
<br /> (OUtof60)
<br /> Bryant Bridge Construct a shared use path and connecting
<br /> 100 B150156 BikePed Division Needs North/Goose Creek Bryant Bridge Granby Park sidewalks from the Kelly Bryant Bridge to Drew- $ 2,009,305 42.95 C 05 Durham Factors 1,2,4
<br /> West Trail Granby Park.
<br /> 100 B141113 BikePed Division Needs NC 157(Guess Road) Hilkrest St W Carver St Coo tract sidewalks on both sides of Guess R&to fill $ 728,937 41.94 C 05 Durham Factors 1,2,3,5
<br /> in sidewalk gaps.
<br /> 100 B141100 BikePed Division Needs NC 55 Riddle Rd Cecil St Construct sidewalks on east side to till in missing $ 543,600 4119 C 05 Durham Factors 1,2,3,4,5
<br /> gaps.
<br /> 100 B150153 BikePed Division Needs Jones Ferry Rd Davie Rd Main St Construct sidewalk on the north side of the roadway $ 448,869 41.46 D 07 Orange Factors 1,2,3,6
<br /> Construct a shared use path from Southern
<br /> Southern Boundaries Park to Cornwallis Rd;construct
<br /> 100 B150144 BikePed Division Needs Third Fork Creek Trail Boundaries American Tobacco Trail sidewalks where needed from Cornwallis Rd to $ 2,573,918 40.26 C 05 Durham Factors 1,2,3,4
<br /> Park American Tobacco Trail;install HAWK beacon at
<br /> Cornwallis Rd Crossing.
<br /> Construct multi-use side path and provide striped
<br /> NC 86(Martin bike lanes along roadway.The Carrboro section of
<br /> 100 B150621 BikePed Division Needs SR 1780(Estes Drive) Luther King Jr.N.Greensboro Street the project(from N.Greensboro Street to Carrboro $ 3,528,826 36.75 D 07 Orange Factors 1,2,3,5,6
<br /> Blvd) Town Limits)includes sidewalks on both side instead
<br /> of multi-use side paths.
<br /> 100 B150664 BikePed Division Needs Duke Belt Line Trail Pettigrew St Avondale Ave Construct a sha red use trail on former rail corridor. $ 6,400,000 34.37 C 05 Durham F actors 1,2,3,4,5
<br /> 100 B150194 BikePed Division Needs Barnes St Jones Ferry Rd King St Construct sidewalk on one side of the roadway. $ 232,907 3129 D 07 Orange Factors 1,2,3,5,6
<br /> 100 H090637 Highway Division Needs SR 1118(Fayetteville Woodcroft Barbee Road Widen SR-1118 to a 4-Lane Divided roadway with $ 19,539,000 32.45 C OS Durham Factors i,2,3
<br /> Road) Pkwy bicycle lanes and sidewalks.
<br /> SR 1006 Orange Grove Road E-sion(Orange Grove Road
<br /> 100 H090647 Highway Division Needs SR 1006(New Route- to US 70)with Sidewalks and Bicycle Lanes.
<br /> g y Orange Grove Road) (Oange US 70A Constmct grade separation at intersection of Orange $ 4,379,000 28.66 D 07 Orange Factors 1,2,3,6
<br /> Grove Road) Grove Road EMension and NCRR
<br /> NC 751(S.Roxboro Rd to NC 54)Widen to4lane,
<br /> Regional South bike lane and sidewalks.This project includes the
<br /> 100 HS50278 Highway Impact NC 751 Rowum Rd Woodcrott Parkway realignment of the NC 751&South Roxboro Road $ 5,189,000 26.50 C OS Durham Factors 1,2,3
<br /> intersection.
<br /> I-40 to Eno River.Widen to Multi-Lanes with
<br /> 100 H000200-A Highway Division Needs 140 Eno River SR 1009(South Landscaped Median,Bicycle Lanes,and Sidewalks, $ 49,757,000 25.53 D 07 Orange Factors 1,2,6
<br /> Ch.mm Street) Widen Bridge No.240 Over Southern Railroad,and
<br /> reconstruct I-85 interchange.
<br /> 8/16/2016 [Page]of3
<br />
|