Orange County NC Website
20 <br /> CHCCS School Impact Fee Report(DRAFT) <br /> C Sch. <br /> The inventory and current LOS for CHCCS middle schools are shown below in Figure 7.As indicated below, <br /> middle school buildings have a total of 506,160 square feet of floor area and two portable classrooms. <br /> Total enrollment in all middle schools is 2,844. LOS factors for CHCCS middle schools are shown in Figure <br /> 7. The adopted LOS standards (based on 107 percent capacity) for school buildings and portables are <br /> shown highlighted in the figure below. As shown,the LOS factors on which the impact fees are based are <br /> 160.68 square feet and 0.0006 portable classrooms per student. <br /> Figure 7. CHCCS Middle Schools <br /> MIDDLE SCHOOLS(6-8) Official <br /> Inventory,Enrollment and Utilization Building Portable SY 15-16 Level of <br /> Facility Square Feet Classrooms Enrollment(1] Capacity Service <br /> Culbreth Middle 122,467 0 716 774 93% <br /> McDougle Middle 138,141 2 689 732 94% <br /> Phillips Middle 109,498 0 642 706 91% <br /> Smith Middle 136,054 0 797 732 109% <br /> TOTAS1 506,160 2 2,844 Z944 97% <br /> Middle School Levels of Service Demand Units(Students) Building SF Portables <br /> LOS per Student based on Current Enrollment 2,844 177.97 0.0007 <br /> LOS per Student based on Capacity 2,944 171.93 0.0290 <br /> LOS based on Adopted LOS Standard(107%) I 3,150 I 160,68 I 4.0006 <br /> [1]Does not include CHCCS students attending the Hospital School. <br /> Source:Orange County;CHCCS <br /> CHCCC ) h Sch—�] <br /> The inventory and current LOS for CHCCS high schools are shown below in Figure 8. As indicated below, <br /> high school buildings have a total of 693,283 square feet of floor area and 22 portable classrooms. Total <br /> enrollment in all high schools is 3,701. LOS factors for CHCCS high schools are shown in Figure 8. The <br /> adopted LOS standards (based on 110 percent capacity) for school buildings and portables are shown <br /> highlighted in the figure below. As shown,the LOS factors on which the impact fees are based are 162.65 <br /> square feet and 0.0052 portable classrooms per student. <br /> Figure 8. CHCCS High Schools <br /> HIGH SCHOOLS(9-12) Official <br /> Inventory,Enrollment and Utilization Building Portable SY 15-16 Level of <br /> Facility Square Feet Classrooms Enrollment 11J Capacity Service <br /> Carrboro High 165,976 0 824 800 103% <br /> Chapel Hill High 254,551 14 1,471 1,520 97% <br /> East Chapel Hill High 267,549 8 1,373 1,515 91% <br /> Phoenix Academy High[2] 5,207 0 33 40 83% <br /> TOTALS1 693,283 22 3,701 3,875 96% <br /> High School Levels of Service Demand Units(Students) Building SF Portables <br /> LOS per Student based on Current Enrollment 3,701 187.32 0.0059 <br /> LOS per Student based on Capacity 3,875 178.91 0.0057 <br /> LOS based on Adopted LOS Standard(110%) I 4,263 I 162.65 I 0.0052 <br /> [1]Does not include CHCCS students attending the Hospital School. <br /> [2]Co-located with Lincoln Center administration and support building <br /> Source:Orange County;CHCCS <br /> 13 <br />