Orange County NC Website
5 <br /> • Clarify that the annual maintenance "inspection" fee is actually an <br /> "inspection/review" fee, as the owner of the stormwater control measure <br /> (SCM) is required to inspect or have the SCM inspected each year and <br /> Engineering/Stormwater staff needs to review that inspection report and <br /> perhaps follow up with an inspection of any repairs. In addition the ordinance <br /> incorporates a quality assurance physical inspection at least once every 5 <br /> years. <br /> • Establish a two-tiered fee schedule for this annual stormwater control measure <br /> annual inspection/review fee, as this is not currently collected. <br /> • Clarify when this fee is to be collected. <br /> 6.14.11 Amendments to Approved Plans and Specifications <br /> • Clarify language, requirements and simplify the amendment procedures. <br /> Table 6.15.7.B.3: Undisturbed Area <br /> • Make it clear that it is the pervious area that needs to remain undisturbed <br /> during construction. <br /> • Correct terminology referring to a "grading permit", as that nomenclature is not <br /> utilized in the UDO. <br /> Various <br /> • Bring conformity and uniformity to the use of the title "County Engineer" in lieu <br /> of "Staff Engineer" in multiple chapters. <br /> • Address any other related variances or inconsistencies that may be found in <br /> other sections during this editing process. <br /> 3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) <br /> Applicable principles, as adopted by the BOCC for the Comprehensive Plan <br /> 1. Efficient and Fiscally Responsible Provision of Public Facilities and Services <br /> 2. Encouraging Sustainable Growth and Development <br /> 6. Water Resource Preservation <br /> Chapter 5: Land Use Element - Section 5.6 GOALS <br /> Land Use Overarching Goal: Coordination of the amount, location, pattern and <br /> designation of future land uses, with availability of County services and facilities <br /> sufficient to meet the needs of Orange County's population and economy <br /> consistent with other Comprehensive Plan element goals and objectives. <br /> Land Use Goal 2: Land uses that are appropriate to on-site environmental <br /> conditions and features, and that protect natural resources, cultural resources, <br /> and community character. <br /> Land Use Goal 6: A land use planning process that is transparent, fair, open, <br /> efficient, and responsive. <br /> 3 <br />