Orange County NC Website
18 <br /> Orange County E9-1-1 System Wreles <br /> Detailed Statement of Work <br /> Implementation <br /> • Provide to Orange County all installation documentation, wiring <br /> diagrams and as-built documentation; <br /> • Will be on site during the installation of the fixed equipment <br /> installation and provide or arrange for additional information and <br /> assistance as required by the installation personnel and/or Orange <br /> County; <br /> • Coordinate the entire optimization effort of this system until <br /> accepted by Orange County; <br /> • Coordinate training and cutover schedules with Orange County; <br /> • Resolve all punch list items to the satisfaction of Orange County <br /> prior to final acceptance of the system; <br /> • Schedule and attend monthly or weekly meetings, depending on <br /> the status and progress of the project, during the system <br /> installation, to keep Orange County up to date on the status of the <br /> system installation. <br /> E9-1-1 Equipment Rack Assembly <br /> The next step in the implementation will be the installation of side "B" <br /> equipment into the new equipment rack. This installation will include <br /> several tasks and subprojects. <br /> Punch Blocks <br /> Punch blocks will be installed onto a plywood board mounted to the wall <br /> of the backup PSAP equipment room, near the planned equipment rack <br /> location. The punch block interfaces for the VESTA system, and <br /> additional punch blocks as needed to provide appropriate industry- <br /> standard connection points for other interconnected equipment, will be <br /> mounted to the board. All inbound telco circuits will terminate on this <br /> board. Cable management devices (e.g., spools, U-rings) will be installed <br /> on the board to provide clean routing for cabling and jumpers. <br /> VESTA Geo-Diverse Upgrade Installation <br /> New VESTA Geo-Diverse 9-1-1 hardware will be installed in the backup <br /> PSAP equipment room. New cabling will be used between the FXO and <br /> FXS Gateways and their respective punch blocks. <br /> The 9-1-1 trunk interface modules will be configured and jumpers <br /> installed to the telco interface punch blocks, as appropriate. Preliminary <br /> alignment will be performed on the trunk interfaces to work with <br /> connected 9-1-1 trunks. <br /> Cutover <br /> Once the VESTA Geo-Diverse switch hardware has been installed and <br /> tested the system will be ready for cutover. Cutover will be conducted in <br />