Browse
Search
Agenda - 09-06-2016 - 6-g - Back-Up 9-1-1 Call Processing Equipment
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 09-06-2016 - Regular Mtg.
>
Agenda - 09-06-2016 - 6-g - Back-Up 9-1-1 Call Processing Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 9:11:28 AM
Creation date
9/1/2016 4:27:15 PM
Metadata
Fields
Template:
BOCC
Date
9/6/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes 09-06-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> Orange County E9-1-1 System Wreles <br /> Detailed Statement of Work <br /> Implementation <br /> • Provide to Orange County all installation documentation, wiring <br /> diagrams and as-built documentation; <br /> • Will be on site during the installation of the fixed equipment <br /> installation and provide or arrange for additional information and <br /> assistance as required by the installation personnel and/or Orange <br /> County; <br /> • Coordinate the entire optimization effort of this system until <br /> accepted by Orange County; <br /> • Coordinate training and cutover schedules with Orange County; <br /> • Resolve all punch list items to the satisfaction of Orange County <br /> prior to final acceptance of the system; <br /> • Schedule and attend monthly or weekly meetings, depending on <br /> the status and progress of the project, during the system <br /> installation, to keep Orange County up to date on the status of the <br /> system installation. <br /> E9-1-1 Equipment Rack Assembly <br /> The next step in the implementation will be the installation of side "B" <br /> equipment into the new equipment rack. This installation will include <br /> several tasks and subprojects. <br /> Punch Blocks <br /> Punch blocks will be installed onto a plywood board mounted to the wall <br /> of the backup PSAP equipment room, near the planned equipment rack <br /> location. The punch block interfaces for the VESTA system, and <br /> additional punch blocks as needed to provide appropriate industry- <br /> standard connection points for other interconnected equipment, will be <br /> mounted to the board. All inbound telco circuits will terminate on this <br /> board. Cable management devices (e.g., spools, U-rings) will be installed <br /> on the board to provide clean routing for cabling and jumpers. <br /> VESTA Geo-Diverse Upgrade Installation <br /> New VESTA Geo-Diverse 9-1-1 hardware will be installed in the backup <br /> PSAP equipment room. New cabling will be used between the FXO and <br /> FXS Gateways and their respective punch blocks. <br /> The 9-1-1 trunk interface modules will be configured and jumpers <br /> installed to the telco interface punch blocks, as appropriate. Preliminary <br /> alignment will be performed on the trunk interfaces to work with <br /> connected 9-1-1 trunks. <br /> Cutover <br /> Once the VESTA Geo-Diverse switch hardware has been installed and <br /> tested the system will be ready for cutover. Cutover will be conducted in <br />
The URL can be used to link to this page
Your browser does not support the video tag.