Browse
Search
Agenda - 09-06-2016 - 6-g - Back-Up 9-1-1 Call Processing Equipment
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 09-06-2016 - Regular Mtg.
>
Agenda - 09-06-2016 - 6-g - Back-Up 9-1-1 Call Processing Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 9:11:28 AM
Creation date
9/1/2016 4:27:15 PM
Metadata
Fields
Template:
BOCC
Date
9/6/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes 09-06-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A 15 <br /> Wreles Orange County E9-1-1 System <br /> Detailed Statement of Work <br /> Overview <br /> Orange County, NC <br /> VESTA E9-1 -1 System Geo-Diverse Upgrade <br /> Detailed Statement of Work <br /> Overview <br /> This document describes the supplied equipment and a detailed <br /> statement of work (SOW) which will be provided by Wireless <br /> Communications, Inc. ("Wireless") to perform a hardware upgrade to the <br /> existing single site VESTA 9-1-1 telephone switch to create a Geo-Diverse <br /> 9-1-1 switch for the Orange County, NC ("Orange County") <br /> Communications Center. This document and other supporting <br /> information will become attached as an addendum to a contract between <br /> Wireless and Orange County for the stated improvements, subject to the <br /> terms and conditions described in this document. <br /> Equipment / Services <br /> The following sections provide general descriptions of the equipment and <br /> services provided under this contract, and the functionality of each. <br /> Where relevant, brief descriptions of implementation details are also <br /> provided. <br /> VESTA Enhanced (E9-1-1) Switch <br /> The existing VESTA 9-1-1 telephone switch will be upgraded to a Geo- <br /> Diverse operating system by relocating and reconfiguring one-half of the <br /> existing server hardware to the backup PSAP communications equipment <br /> room. <br /> The new VESTA Geo-Diverse 9-1-1 side "B" equipment rack and <br /> associated hardware will be installed in the backup PSAP equipment <br /> room. New cabling will be used between the FXO Gateways and their <br /> respective punch blocks. <br /> Additional VESTA system hardware to be provided and installed at the <br /> backup PSAP consists of the follows: <br /> • Redundant power supplies; <br /> • New FXS Gateways; <br /> • New Cisco or HP switches; <br /> • New Firewall. <br /> Workstations <br /> The existing VESTA workstations will be used and will require no <br /> modifications. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.