Browse
Search
2016-487-E AMS - Hillsborough Plumbing Co, Inc. to replace water pump and piping
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-487-E AMS - Hillsborough Plumbing Co, Inc. to replace water pump and piping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2016 3:30:57 PM
Creation date
9/1/2016 12:21:54 PM
Metadata
Fields
Template:
BOCC
Date
8/25/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$16,400.00
Document Relationships
R 2016-487-E AMS - Hillsborough Plumbing Co, Inc. to replace water pump and piping
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7C64F6F6-183B-4CE7-90AC-CB4486B1 EBDO <br /> HILLSBOROUGH PLUMBING CO., INC. <br /> 1020 Hwy. 57 N. <br /> Hillsborough, NC 27278 PROPOSAL <br /> N.C. PLUMBERS LIC. #30516 <br /> PHONE: (919)732-4506 <br /> FAX: (919)732-5804 <br /> August 22, 2016 <br /> TO: Orange County ATTN: Angel Barnes <br /> JOB NAME/LOCATION: Orange County—Cedar Grove Building <br /> We hereby submit estimates for: <br /> Item#1: <br /> — Remove existing domestic water booster pump that is pumping water from holding tank in pump <br /> room and keeping pressure on occupied building. <br /> — Existing system to be evaluated by designer for recommendation of pump and controls to be re- <br /> installed. <br /> — Install new 1 HP pump with variable frequency drive to minimize water hammer at end of pump <br /> cycle. All piping to be installed as required from outlet of storage tank to outlet of new pump <br /> system and connected to existing piping. <br /> — Electrical requirements for new pump system shall be comparable to existing pump to minimize <br /> electrical work required. All electrical re-work and connection is included in quoted price. <br /> — Permits for electrical and plumbing are included in quoted price. <br /> — All exposed piping in pump room installed under this scope of work shall be insulated with 1" <br /> wall fiberglass insulation. <br /> Total Price: $12,600.00 <br /> Item#2: <br /> - Replace existing water piping from outlet side of new pump system to where piping exits pump <br /> room through wall. All existing CPVC piping in pump room shall be removed and replaced with <br /> copper. <br /> — All isolation valves shall be installed as required for isolation between main building and softball <br /> complex. <br /> — All exposed piping in pump room installed under this scope of work shall be insulated with 1" <br /> wall fiberglass insulation. <br /> Total Price: $3,800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.