Browse
Search
2016-472 County Atty - Wake County, et al - Interlocal Agreement re Mutual Understanding as to the Scope and Content of the Financial Plan (not final)
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-472 County Atty - Wake County, et al - Interlocal Agreement re Mutual Understanding as to the Scope and Content of the Financial Plan (not final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 4:34:02 PM
Creation date
9/1/2016 10:22:15 AM
Metadata
Fields
Template:
BOCC
Date
9/1/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$0.00
Document Relationships
R 2016-472 Co. Atty. - Wake County, et al - Interlocal Agreement re Mutual Understanding as to the Scope and Content of the Financial Plan
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> pg. 30 of 69 <br /> E. New Light Rail Service <br /> The Orange County Bus and Rail Investment plan provides funding for a fixed guideway <br /> transit system that would connect Durham and Orange counties using Light Rail <br /> technology(LRT). The 173-mile alignment extends from the University of North Carolina <br /> (LING)Hospitals to Alston Avenue/NCCU in East Durham. A total of 17 stations have been <br /> proposed including a station at Mason Farm Road,Hamilton Road,the UNC Friday Center, <br /> as well as a potential station at Woodmont/Hillmont or Meadowmont in Chapel Hill. <br /> Stations in Durham include Patterson Place along US 15-501,the South Square area,at <br /> Duke Medical Center,Ninth Street,and downtown Durham,with convenient access to <br /> nearby bus and Amtrak Intercity rail connections. Due to the light rail vehicie's <br /> capabilities and the requirements of the activity centers and neighborhoods being served <br /> along the corridor,light rail stations are routinely spaced between X mile and 2 miles <br /> apart. <br /> Light Rail vehicles are electrically powered and travel at speeds up to 55 mph. The total <br /> travel time for the 17.3-mile alignment Is about 35 minutes,including stops. The vehicles <br /> are approximately 90 feet long and can operate in both directions.Additional cars can be <br /> added as the demand increases. Recent 2035 projections indicate that ridership will <br /> exceed approximately 14,000 boardings per day. These projections are subject to change <br /> as the demand model Is refined and as development,population and employment <br /> changes are recognized. <br /> Light rail vehicles can operate in exclusive right of way,as well as along urban streets,and <br /> characteristically serve accessible low platforms(14 inches high)at each station. The <br /> operations plan for the 17.3-mile alignment includes train frequencies(headways/e.g. <br /> time between each train)of 10 minutes during the morning and evening peak and 20 <br /> minutes during the off-peak hours and on weekends. Vehicles will operate on an 18-hour <br /> schedule each weekday. Several potential light rail vehicle maintenance facility locations <br /> are being evaluated.Detailed alignment and station location decisions will be made at the <br /> end of Preliminary Engineering. <br /> The total capital cost for the Durham and Orange Light Rail Project is approximately <br /> $1.378 billion(2011 dollars). Orange County's share is$316.2 million in 2011 dollars, <br /> which is the same as$418.3 million in Year-0f-Expenditure(YOE)dollars. Operations and <br /> Maintenance costs are estimated at$14.44 million/year(2011 dollars). Orange County's <br /> share of the Operations and Maintenance costs are$3A6 mllllon/year(2011 dollars). For <br /> Orange County's share of the capital cost of the Light Rail project the total cast allocation <br /> Is Orange County 25%,and an assumed State participation of 25%and Federal <br /> Participation of 50%. <br /> Cost estimates for the light rail project have been developed with multiple conservative <br /> assumptions.Included in the$1.378 billion total project cost are the following <br /> contingencies: <br /> • 30%contingency on all civil engineering construction costs(stations,sitework, <br /> track,yard&shop) <br /> a 20%contingency on systems(signals,electricity,communications) <br /> 9/27/2012-Page 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.