Orange County NC Website
(3) The Contractor acknowledges and agrees that qualifications-based competitive <br /> proposal procedures can only be used for procurement of the following services: <br /> (a) Program management; <br /> (b) Construction management; <br /> (c) Feasibility studies; and <br /> (d) Preliminary engineering, design, architectural, engineering, surveying, <br /> mapping, and related services. <br /> (4) The Contractor also agrees to: <br /> (a) Include applicable Federal requirements and certifications in the <br /> solicitation; <br /> (b) Submit procurement documents to the Department for its review and <br /> approval prior to the award of any contract for A&E services for the <br /> Project; and <br /> (c) Maintain written documentation to support each step of the <br /> procurement process. <br /> r. Desiqn-Bid-Build Projects. The Design-Bid-Build method of construction is where <br /> there are separate contracts and procurement processes for the design and construction. Typically the <br /> designer coordinates the numerous prime contractors that are involved in the construction process. <br /> The Contractor may use design-bid-build procurements to implement its projects after it has complied <br /> with applicable Federal and State requirements and obtains approval from the Department prior to <br /> solicitation and award of the contract. <br /> S. Design-Build Projects. The Design-Build method of construction is where a single <br /> contractor is given responsibility for both design and construction, thus eliminating an intermediate <br /> procurement step with possible time saving, and more effective coordination and opportunities for cost <br /> savings. Currently, this procurement method is not an allowable method of procurement by the State of <br /> North Carolina. The Contractor may request to use the design-build method as an "alternate" method. <br /> Submission of justification must be presented to the State Building Commission for a 2/3-majority vote <br /> of approval. One of the drawbacks of design-build is that the owner does not have an independent <br /> source (the A/E in traditional construction) overseeing design implementation and verifying <br /> conformance with the drawings and specifications. <br /> t. Competitive Proposal/Request for Proposal (RFP). The competitive proposal/ <br /> request for proposal (RFP) method of procurement is normally conducted with more than one source <br /> submitting an offer, i.e., proposal. Either a fixed price or cost reimbursement type contract is awarded. <br /> This method of procurement is generally used when conditions are not appropriate for the use of sealed <br /> bids. The Contractor acknowledges that certain restrictions apply under North Carolina law for use of <br /> the RFP method and these restrictions and exceptions are discussed below. <br /> (1) The Contractor agrees that the RFP Method may not be used in lieu of an <br /> invitation for bids (IFB)for: <br /> (a) Construction/repair work; or <br /> (b) Purchase of apparatus, supplies, materials or equipment. See <br /> Subsection 14t(2), this Agreement, regarding information technology <br /> goods as services. <br /> (2) The Contractor agrees that the RFP method of solicitation may be used (in <br /> addition to or instead of any other procedure available under North Carolina law) for the procurement of <br /> information technology goods and services [as defined in N.C.G.S. 147-33.81(2)]. This applies to <br /> electronic data processing goods and services, telecommunications goods and services, security goods <br /> and services, microprocessors, software, information processing, office systems, any services related <br /> to the foregoing, and consulting or other services for design or redesign of information technology <br /> supporting business processes. The Contractor will comply with the following minimum requirements <br /> [N.C.G.S. 143-129.8]: <br /> (a) Notice of the request for proposals shall be given in accordance with <br /> N.C.G.S. 143-129(b). <br /> (b) Contracts shall be awarded to the person or entity that submits the best <br /> overall proposal as determined by the awarding authority. Factors to be <br /> 05/27/2015 Page 17 of 35 <br />