Browse
Search
2016-456-E DEAPR - Summit Design and Engineering Services for construction materials testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-456-E DEAPR - Summit Design and Engineering Services for construction materials testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:25:23 PM
Creation date
8/18/2016 8:06:56 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2016
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$8,365.00
Document Relationships
R 2016-456-E DEAPR - Summit Design and Engineering Services for construction materials testing
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID 4230r103~^288-4o08e8e0'1e0C0o115E45 <br /> Proposal for CMT Services Summit Proposal#T16-0065 <br /> Fairview Park Parking Area August 11, 2016 <br /> Hillsborough,North Carolina <br /> • Unusual occurrences will be communicated in a timely manner. <br /> • Scheduling conflicts do to contractor error, work cancellations upon Summit's arrival, <br /> retesting and non-compliance testing, and contractor's convenience testing will be tracked <br /> throughout pr ject and reported to owner for tracking purposes of appropriate back charges <br /> to contractor. <br /> • Non-conforming items that are not corrected on the same date that they are initially <br /> observed, will be communicated to the owner, building official, general contractor, and <br /> design team immediately. <br /> • The results of concrete, grout and mortar compressive strength testing will be available <br /> electronically to the project team within 48 hours, as the tests are performed. Test results <br /> will be available tb,ougbo'ouuU, and summarized in our monthly summary report. <br /> • A typed final report of our services will be prepared by our Pr ject Manager, reviewed and <br /> sealed by our Registered Engineer,and distributed to specified members of the project teanu <br /> on a monthly basis, as well as a Final Report at the end of pr 'ecL <br /> The p ject will be closely managed to identify potential budget and schedule impacts during the <br /> course of the project. Summit's project manager will also monitor field operations for possible <br /> out-of-scope items that develop during the course of the project that are not included in this <br /> proposal and preliminary fee estimate. <br /> We have included budget for construction kickoff meeting, technical consultation and for special <br /> site meetings due to unanticipated conditions or design changes during construction. Since this <br /> scope cannot be fully defined at this time, we allocated budget based on prior projects of similar <br /> nature. <br /> Task 007—Final Report <br /> Upon completion of the pr ject, a final summary report will be prepared by Summit to document <br /> geotechnical observations, testing services and laboratory testing services during this phase of <br /> construction. In the event other pr ject deliverables become required for reasons unknown at this <br /> time, including but not limited to failed test items requiring further analysis and/or reporting, <br /> additional fees may be incurred beyond those contained in the attached fee estimate. <br /> SCHEDULE <br /> As of the date of this proposal, we have not received a construction schedule. We anticipate that 1 <br /> Summit representative will be required onsite on a full-time to part-time basis throughout <br /> construction. For scheduling of our field-personnel, Summit must be contacted prior to 1:00 p.m. <br /> the day before our services are required and/or at least 24 hours in advance. Our visits will be <br /> coordinated with the contractor's project site superintendent and/or an owner's representative. <br /> Summit will be available for inspection services 7 days a week and 24 hours per day,as requested. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.