Orange County NC Website
DocuSign Envelope ID:4236F103-A289-4D68-B8B0-1 B6COD115E45 <br /> Proposal for CMT Services Summit Proposal#T16-0065 <br /> Fairview Park Parking Area August 11, 2016 <br /> Hillsborough,North Carolina <br /> (2) interpretation or modification of the project plans or specifications; (3)submittal of test results <br /> or reports to any regulatory agency (unless specifically requested by owner in writing); or (4)job <br /> site safety. The following tasks outline our proposed scope of services for this project. <br /> Task 001 —Pre-Construction Meeting and Review of Project Documents <br /> Summit's Project Manager or Lead Engineer and/or Lead Inspector will attend a pre-construction <br /> meeting with the owner's representative, the contractor, and fellow the design team members to <br /> review requirements for the project prior to beginning construction activities. We will also review <br /> grading and utility plans prepared for the project. The plans will be reviewed from a geotechnical <br /> perspective for conformance with recommendations provided in the final geotechnical report for <br /> the project. <br /> Task 002—Geotechnical Observation and Testing Services <br /> Summit will provide a senior engineering technician working under the supervision of a registered <br /> engineer to perform subgrade observations (proofrolls) and compaction testing services during <br /> onsite grading activities. We anticipate that observation and testing will be required during <br /> earthwork and associated construction for the following: <br /> • Observe topsoil removal; <br /> • Site work and grading operations during excavations and fill placement; <br /> • Utility trench backfill and compaction; and <br /> • Subgrade preparation and compaction access drives and parking lots; <br /> Compaction testing following grading will generally be performed as required by the reviewing <br /> agency, geotechnical report, and project documents. We anticipate we will be required to perform <br /> field density testing using American Society for Testing and Materials (ASTM) procedures. Our <br /> personnel will sample on-site and imported materials used as fill and transport these samples to <br /> our laboratory for testing. Our visits will be coordinated with the contractor's project site <br /> superintendent and/or the owner's representative. <br /> Task 003—Cast-In-Place Concrete Construction and Reinforcement Placement <br /> Summit will provide a senior engineering technician working under the supervision of a registered <br /> engineer for full-time inspection, sampling,and field testing services during placement of concrete <br /> for curb and gutter and hardscapes. <br /> If applicable, prior to the placement of concrete, we will provide a senior engineering technician <br /> to periodically observe the size,type,and placement(lap lengths,ties,and cover)of the reinforcing <br /> steel (rebar) prior to placement of structural cast-in-place concrete. We will also provide a senior <br /> engineering technician to observe the placement, curing, and protection of cast-in-place concrete. <br /> We will perform slump, air content, unit weight, and temperature testing during cast-in-place <br /> concrete placement. Concrete batch tickets will be monitored during placement for mix design <br /> compliance. <br /> 2 <br />