Browse
Search
2016-456-E DEAPR - Summit Design and Engineering Services for construction materials testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-456-E DEAPR - Summit Design and Engineering Services for construction materials testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2016 3:25:23 PM
Creation date
8/18/2016 8:06:56 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2016
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Amount
$8,365.00
Document Relationships
R 2016-456-E DEAPR - Summit Design and Engineering Services for construction materials testing
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID 4230r103~^288-4o08e8e0'1e0C0o115E45 <br /> Proposal for CMT Services Summit Proposal#T16-0065 <br /> Fairview Park Parking Area August 11, 2016 <br /> Hillsborough,North Carolina <br /> FEE ESTIMATE <br /> Based on the scope of services outlined herein and our understanding of the available pr jcoi <br /> construction information,we recommend a budget allowance of$8,365 be included for the cost of <br /> our services as described herein. Our proposed budget allowance will not be exceeded without <br /> prior client notification, and would be increased only via contract amendment. Please refer to the <br /> attached Estimated Cost Summary for a more detailed breakdown of the estimated fees and our <br /> assumptions. <br /> Our recommend budget allowance is based on providing the scope of services outlined herein only. <br /> If the construction schedule, actual material quantities,or requirements for the project are different <br /> from what we have described herein, we reserve the right to review our scope and budget <br /> allowance with respect to the new information and propose necessary changes to our Client. Some <br /> factors that commonly affect our proposed budget allowance include re-testing and re-inspections, <br /> overtime work, adverse weather events that affect the construction materials on-site or our <br /> scheduling, additional laboratory testing, performance of additional services not explicitly listed <br /> herein, and poor scheduling(or late cancelling)of our field services by the GC's personnel. Please <br /> note that the budget allowance stated and illustrated herein does not constitute a "lump sum" fee <br /> for our services. Our services will be invoiced on an on-call, time and materials basis at the rates <br /> indicated on the attached unit fee schedule for those services we are requested to provide by the <br /> GC throughout the pr ject construction duration. <br /> ASSUMPTIONS <br /> During our proposal preparation certain assumptions were required based on our review of the <br /> project plans. Based on the available information(noted above), the following assumptions apply: <br /> • A 4-hour minimum charge will be made for all field services. <br /> • Rates associated with overtime work are at 1.5 times the listed hourly rates in the attached <br /> fee schedule and rates shown on the Fee Summary. Overtime for our services is defined as <br /> work on the project by a single person in excess of 8 hours per day and all time on <br /> weekends, Summit recognized holidays, and night shifts. <br /> • Crews will be working at a pace and distance from one another such that 1 field personnel <br /> per day is sufficient to observe the work; <br /> • Weekend and/or night work is not anticipated for this project; <br /> • Laboratory testing and field compaction testing will be performed in general accordance <br /> with ASTM standards; <br /> • Proposal based on testing services over a 6-month construction period; <br /> • Includes a 5% field services contingency for weather delays, retests, construction delays; <br /> LIMITATIONS <br /> Construction materials observation, testing, and special inspection services provided by Summit <br /> will be performed in accordance with generally accepted procedures practiced within the pr 'oot <br /> area. It should be noted even with diligent monitoring construction defects may occur. In all cases, <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.