Orange County NC Website
aI <br />EXHIBIT B <br />BUILDING PLANS AND SPECIFICATIONS <br />The following plans and specifications pertaining to the Building are incorporated herein by this reference: <br />1. Gateway Center Site Plan, Utilities and Erosion Control Plans and Specifications consisting of <br />Drawing Nos. 1 - 16 prepared by Summit Consulting Engineers last revised November 16, 2006 <br />(Project No. 05-032). <br />Code Data, Elevations, Floor Plans, Roof Plan and other Building Plans, Cross Sections and <br />Details for The Gateway Center consisting of Sheet Nos. Al - A13 prepared by John C. <br />Williams, Architect, last revised December 6, 2006 (Job No. 0600). <br />3. Foundation, Framing and Other Plans for The Gateway Center consisting of Sheet Nos. S 1 - S6 <br />prepared by Gardner & McDaniel Consulting Engineers dated October, 2006 (Job No, 06073). <br />4. Plumbing, Sanitary Waste, Vent and Water Supply Plans, Specifications, Calculations and <br />Details for The Gateway Center consisting of Sheet Nos. P-1 - P-9 prepared by John C. <br />Williams, Architect, dated November 16, 2006 (Job No. 77-06). <br />5. Mechanical Specifications, Notes, Schedules, Details and Plans for The Gateway Center <br />consisting of Sheet Nos. M-1 - M-6 prepared by John C. Williams, Architect, dated November <br />16, 2006 (Job No. 77-06). <br />6. Electrical Specifications and Schedules for The Gateway Center consisting of Sheet Nos. E-1 - <br />E-5 prepared by John C. Williams, Architect, dated November 16, 2006 (Job No. 77-06). <br />7. Technical Specifications for Gateway Center prepared by Brockwell Associates, Inc., Architect <br />-19-