Orange County NC Website
03/01/04 , 14:13 GREGORY POOLE POWER SYSTEms }'Wd9b76-'.Z •JPN anvil p0AIa09dNO.278 <br />PAT-Eftt <br />Gregory Powe Power 0011fastems <br />: RIMY. <br />401 Blue Ridge Read Teiaphont (919) 890.4656 QuOtafion <br />Rale3eh, North Carolina 27606 Fax (919) $90-#334 Psge 2 aP 2 <br />Project: RMbaraagh 911 Center February 24, 2004 <br />Quotafion No: X034423-01 Prepared by: David Willard <br />(1) Caterpillar Model 3306 Diesel Package Generator Set, Rated 200kW Standby, 60 Hz at <br />1800 RPM, Single Phase, 120-240 Volts. Includes the following accessories: <br />UL2200 Listing <br />Electronic Modular Control Panel with Alarm Package <br />Electronic Isochronous Governor <br />Radiator with Engine Driven Fan <br />Critical Grade Exhaust Silencer <br />Stainless Steel Flexible Connection <br />Lead Acid Starting Battery with Rack and Cables <br />Battery Changer, 10 Amps <br />Coolant Heater <br />Output Circuit Breaker, Mounted on Generator <br />Weaftw Protective Enclosure <br />UL Listed Double Wall Fuel Tank (24 Hour Supply at 100% Load) <br />Structural Steel Bass, with Vibration Mounts <br />Lubricating Oil and Antifreeze -- Initial Fill <br />Operation and Maintenance Manuals. <br />Thomson Automatic Transfer Switch, 600 Amps, 2 Pole, Service Entrance <br />Installation by T. L. Worley Electric, Inc. <br />Caterpillar Two (2) Year Parts and Labor Warranty <br />Startup and Testing During Normal Business Hours <br />$00kW 24[1V NET PRICE, FOB JOSSITE $42,220.00 <br />Labor to Install Equipment $15,529.00 <br />Matierials to Install Equipment $8,000.00 <br />Concrete Pad to Mount Equipment $1,000.00 <br />Total Turnkey Price $66,749.00 <br />Price DOES NOT include the following: <br />-Slate and local sales tax <br />-Fuel for startup and testing <br />PLEASE REVIEW YOUR. SPECIFICATIONS TO BE SURE THAT THE APPARATUS DESCRXfiW ABOVE MEETS YOUR REQUIREMEMS. This <br />quotation coves ileum lisoed'herain and does not comlitute a Specifc job proposal. All equipment fwrisW loom for insmonaion by ethers unless specifically <br />listed as imWled. SutmUp. Testing, A Training io bo per onmd during normal busieeta )mra unkaa apeeitkally indimred otherwise Relay indlar System <br />Coordinstimt Study Ij not included unle6a specirkally noted. Telephone and verbal orders am lobe canfirTned irk writing. We resets the right to coQ = <br />strnogayRiC of clttioal errors Gregory Poole Power Systtsrm not respondble for occummes beyond our control. Thin quotation is made subject to Gregory <br />Poole Standrad Tama and Conditions. Tbia gtwmtion is vw id for Forty-five (45) days fium date of ime. <br />ACCEPTANCE <br />DATE <br />BY GIWWRY POOLE POWER SYSTMAS <br />Pndd Willard DATE 0310110+1 <br />D02 <br />a <br />Z0/Z0 39VcJ OM OI-iand 00 39NVi 10 9TO60096Z6 96:60 b00Z/Z0/E0