Browse
Search
2016-422-E AMS - Tibbens Construction - SHSC interview rm. #5 renovation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-422-E AMS - Tibbens Construction - SHSC interview rm. #5 renovation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2016 8:01:45 AM
Creation date
8/8/2016 2:12:04 PM
Metadata
Fields
Template:
BOCC
Date
8/5/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$2,600.00
Document Relationships
R 2016-422-E AMS - Tibbens Construction - SHSC interview rm. #5 renovation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:9F65F1B2-3BE4-4133-A023-C80F60F07140 • <br /> Contractor Quote <br /> From: Tibbens Construction e <br /> 849 Moose Tracks Trl <br /> Cedar Grove NC 27231 <br /> To: Orange County Work Performed at: <br /> PO box # 8181 Hillsborough NC 27278 Southern Human Services <br /> 2551 Homestead Rd Chapel Hill NC 27278 <br /> Date: 7-25-2016 <br /> Your Work Order No.: <br /> Our Bid No.: <br /> Description of Work Performed: Renovate room # 5 for use as an interview rm. <br /> Remove existing carpet tile and replace with new carpe tile (color and pattern selected by <br /> owner). <br /> Existing cove base will be replaced. (Color selected by owner) <br /> Remove existing counter tops and dispose of. <br /> Provide and install new chair rail to match existing where counter tops where removed <br /> Prep & paint walls and trim with colors selected by owner <br /> All trim will have semi-gloss finish. Walls will have egg shell finish <br /> Cost for renovation - $ 2,600.00 <br /> If the suppliers minimum quantity purchased exceeds 100 sq. ft. the cost difference will be charged to <br /> Owner. <br /> All Material is guaranteed to be as specified, and the above work will be performed in <br /> accordance with the drawings and specifications provided for the above work and will be <br /> completed in a substantial workmanlike manner for the agreed sum of Dollars <br /> ($2,600.00). <br /> wvAv.socrates.com Page 1 of 1 SS43o1-250•Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.