Browse
Search
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 9:39:36 AM
Creation date
7/26/2016 11:11:58 AM
Metadata
Fields
Template:
BOCC
Date
7/25/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$339,000.00
Document Relationships
2017-085-E DEAPR - McQueen Construction, Inc. - Change Order to Contract for Fairview parking expansion project for cost reduction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 06-21-2016 - 5-i - Authorization to Award the Bid and Contract for Construction of the Fairview Park Parking Expansion Project
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 06-21-2016 - Regular Mtg.
R 2016-398-E DEAPR - McQueen Construction, Inc. for Fairview parking expansion - 6-21-2016, Item 5-i
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2E5A8509-E4CD-4A45-9241-C69B05F6A27D <br /> 35 <br /> 15.5 Where the Contract Price is to be adjusted by negotiation, the Owner may authorize and <br /> designate the Designer to negotiate with the Contractor on behalf of the Owner; provided, <br /> however, any agreement reached between the Contractor and Designer shall be subject to <br /> approval by the Owner. <br /> ARTICLE 16. UNFORESEEN CONDITIONS <br /> 16.1 Should the Contractor encounter unforeseen conditions at the Project site materially <br /> differing from those shown on the Drawings or indicated in the Specifications or differing <br /> materially from those ordinarily encountered and generally recognized as inherent in work of the <br /> character provided for in this Agreement, the Contractor shall immediately, and in no event <br /> more than three days later, give notice to the Owner of such conditions before they are <br /> disturbed. The Owner and the Designer shall thereupon promptly investigate the conditions and <br /> if they find that they materially differ from those shown on the Drawings or indicated in the <br /> Specifications, they shall at once make such changes in the Drawings and/or Specifications as <br /> they may find necessary. Any increase or decrease in the Contract Price resulting from such <br /> changes shall be adjusted in the manner provided herein for adjustments as to extra and/or <br /> additional Work and changes. However, neither the Owner nor the Designer shall be liable or <br /> responsible for additional work, costs, or changes to the Work that could have been reasonably <br /> determined from any reports, surveys, and analyses made available for the Contractor's review <br /> or that could have been discovered by the Contractor through the performance of its obligations <br /> pursuant to the Contract Documents. <br /> ARTICLE 17. CORRECTION OF WORK BEFORE FINAL PAYMENT <br /> 17.1 The Owner has the authority to stop or suspend work, and the Designer has the authority <br /> to order Work removed or to order corrections of defective Work or Work not in compliance with <br /> the Contract Documents where such action may be necessary to ensure successful completion <br /> of the Work. <br /> Any work, materials, fabricated items, or other parts of the Work which have been found by the <br /> Designer to be defective or not in accordance with the Contract Documents shall be condemned <br /> and shall be removed from the Project by the Contractor, and immediately replaced by new <br /> Work in accordance with the Contract Documents at no additional cost to the Owner. Work or <br /> property of the Owner or others damaged or destroyed by virtue of such condemned Work shall <br /> be made good at the expense of the Contractor. Correction of condemned Work described <br /> above shall be commenced by the Contractor within twenty-four (24) hours after notice from the <br /> Designer or the Owner and shall be pursued to completion. Should the Contractor fail to <br /> proceed reasonably with the abovementioned corrections, the Owner may, three (3) days after <br /> the notice specified in the preceding sentence, proceed with correction, paying the cost, <br /> including costs of uncovering such condemned Work, of such corrections from amounts due or <br /> to become due to the Contractor. <br /> Condemned Work removed shall be the property of the Contractor and shall be removed from <br /> the Project by him within ten (10) days after notice to remove it, and if not then removed, <br /> thereafter may be disposed of by the Owner without compensation to the Contractor and the <br /> Revised 6/16 <br />