Browse
Search
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 9:39:36 AM
Creation date
7/26/2016 11:11:58 AM
Metadata
Fields
Template:
BOCC
Date
7/25/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$339,000.00
Document Relationships
2017-085-E DEAPR - McQueen Construction, Inc. - Change Order to Contract for Fairview parking expansion project for cost reduction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 06-21-2016 - 5-i - Authorization to Award the Bid and Contract for Construction of the Fairview Park Parking Expansion Project
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 06-21-2016 - Regular Mtg.
R 2016-398-E DEAPR - McQueen Construction, Inc. for Fairview parking expansion - 6-21-2016, Item 5-i
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2E5A8509-E4CD-4A45-9241-C69B05F6A27D <br /> 29 <br /> the Contractor's activities are also shown. The Contractor further represents that the Contractor <br /> can and will complete each activity within the time shown for that activity. Time is of the <br /> essence with respect to each such activity and Completion Date. <br /> 13.5 If the Contractor submits a construction schedule, progress report, or any other document <br /> that indicates or otherwise expresses an intention to achieve completion of the Work prior to any <br /> Completion Date required by the Contract Documents or prior to expiration of the Contract <br /> Time, no liability of the Owner to the Contractor for any failure of the Contractor to so complete <br /> the Work shall be created or implied. <br /> 13.6 If the Contractor, for reasons beyond the Contractor's control, is delayed in beginning any <br /> activity, the Contractor shall, nevertheless, have the same number of days as is shown in the <br /> Contract Construction Schedule for the activity, and the affected activity and any succeeding <br /> activity that is dependent upon that activity shall be adjusted accordingly; provided that at any <br /> time the Owner, by means of a Change Order, may require the Contractor to work overtime, to <br /> increase labor forces or to take any necessary or appropriate action to decrease the time <br /> required for any activity, and the Contractor shall be entitled to an adjustment in the Contract <br /> Price computed in accordance with Article 15 of these General Conditions. <br /> 13.7 At any time, the Owner may order the Contractor, on seven (7) days written notice, to <br /> begin any activity earlier than the starting date shown on the Contract Construction Schedule. <br /> 13.8 Should the Contractor fail to start any activity on the start date shown in the Contract <br /> Construction Schedule or as it may have been adjusted in accordance with paragraphs 13.5 or <br /> 13.6 above, or become delayed, the Contractor shall, without being entitled to any increase in <br /> the Contract Price or other compensation, work overtime, increase labor forces or take such <br /> other action as may be necessary or appropriate to complete the activity by the Completion <br /> Date shown on the Contract Construction Schedule, or as such Completion Date may have <br /> been adjusted. <br /> 13.9 The Designer and Owner or his Construction Consultant shall monitor progress of the work <br /> at all times and the Contractor shall cooperate with such monitoring and provide any and all <br /> information with respect to the progress of the Work and scheduling as the Owner may <br /> reasonably require. <br /> 13.10 On a monthly basis, the Contractor shall revise the Contract Construction Schedule, <br /> showing any adjustments made in accordance with paragraphs 13.5 or 13.6, above, by any <br /> Change Order, the progress of the Work, and any days gained or days lost with respect to any <br /> activity, and shall furnish copies thereof to the Owner and Designer. <br /> 13.11 Should any monthly revision of any Contract Construction Schedule show that the <br /> Contractor is behind on any activity, the late completion of which could delay Substantial <br /> Completion of the Work, the Owner shall be entitled to withhold from the next Progress Payment <br /> due the Contractor an amount not exceeding the amount the Owner would be entitled to in <br /> Liquidated Damages, should Substantial Completion be delayed by the same number of days <br /> that the Contractor is currently behind schedule. If, subsequently, the Contractor's progress, as <br /> shown by any succeeding monthly revision to the Contract Construction Schedule, is such that <br /> the anticipated delay no longer exists, the Owner shall pay with the Progress Payment next due <br /> to the Contractor such amounts as have been withheld in accordance with this paragraph. <br /> Revised 6/16 <br />