Browse
Search
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 9:39:36 AM
Creation date
7/26/2016 11:11:58 AM
Metadata
Fields
Template:
BOCC
Date
7/25/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$339,000.00
Document Relationships
2017-085-E DEAPR - McQueen Construction, Inc. - Change Order to Contract for Fairview parking expansion project for cost reduction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 06-21-2016 - 5-i - Authorization to Award the Bid and Contract for Construction of the Fairview Park Parking Expansion Project
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 06-21-2016 - Regular Mtg.
R 2016-398-E DEAPR - McQueen Construction, Inc. for Fairview parking expansion - 6-21-2016, Item 5-i
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2E5A8509-E4CD-4A45-9241-C69B05F6A27D <br /> 27 <br /> 10.2 All Work completed under the Contract Documents shall be subject to review by the <br /> Designer. No Work is to be covered without the Designer's review or prior authorization. <br /> Any Work so covered without the Designer's review or prior authorization shall be uncovered at <br /> the Contractor's expense. The Contractor shall notify the Designer in writing at least twenty-four <br /> (24) hours in advance of covering any Work. <br /> 10.3 The Designer shall not be responsible for the construction means, methods, techniques, <br /> sequences, procedures, or the safety precautions and programs incident thereto, and shall not <br /> be responsible for the Contractor's failure to perform the Work in accordance with the Contract <br /> Documents, but shall be entitled to enforce any requirements in the Contract Documents <br /> specifying particular means, methods, techniques, sequences, or procedures. <br /> 10.4 The Designer shall be an Owner's representative during the construction period. The <br /> duties, responsibilities and authority of the Designer as the Owner's representative during <br /> construction are as set forth in the Contract Documents. <br /> ARTICLE 11. TESTING AND SURVEYING <br /> 11.1 Laboratory and field tests to determine compliance of construction with the Contract <br /> Documents shall be made by the Owner or testing consultants employed by the Owner except <br /> those required elsewhere in the Contract Documents to be paid for by the Contractor. The costs <br /> and expenses of providing samples for and assistance in any testing shall be borne by the <br /> Contractor and are included in the Contract Price. Any Work in which untested materials are <br /> used without approval or written permission of the Designer shall be removed and replaced at <br /> the Contractor's expense. Work found to be unacceptable or unauthorized will not be paid for <br /> and, if directed by the Designer shall be removed and replaced at the Contractor's expense. <br /> Unless otherwise designated, tests in accordance with the cited standard methods of ASTM or <br /> other generally recognized or specifically authorized methods which are current on the date of <br /> advertisement for bids shall be made at the expense of the Owner; provided, however, in the <br /> event that after such testing any Work is found to be defective or does not meet the <br /> requirements of the Contract Documents, the costs of retesting such Work and the costs of <br /> inspection services shall be paid by the Contractor. Samples shall be taken by a testing <br /> laboratory employed by the Owner. All materials being used are subject to inspection, tests, or <br /> rejection at any time prior to or during incorporation into the Work. Copies of all Owner test <br /> reports will be furnished to the Contractor at his written request. Copies of Contractor test <br /> reports shall be furnished to the Designer upon written request. <br /> 11.2 The Owner shall have the right to deduct the costs of additional testing as described in <br /> paragraph 11.1 from any money due the Contractor; or if no money is due the Contractor, the <br /> Owner shall have the right to recover these costs from the Contractor, from its sureties, or from <br /> both. <br /> 11.3 All layouts and surveying shall be accomplished by properly qualified personnel duly <br /> licensed in the State of North Carolina. <br /> ARTICLE 12. SEPARATE CONTRACTS <br /> 12.1 It is expressly understood that the Owner may deploy the Owner's own employees or <br /> engage other separate prime contractors to perform Work as a part of the Project whose work <br /> Revised 6/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.