Browse
Search
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-398-E DEAPR - McQueen Construction, Inc. - Fairview parking expansion - 6-21-2016, Item 5-i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 9:39:36 AM
Creation date
7/26/2016 11:11:58 AM
Metadata
Fields
Template:
BOCC
Date
7/25/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$339,000.00
Document Relationships
2017-085-E DEAPR - McQueen Construction, Inc. - Change Order to Contract for Fairview parking expansion project for cost reduction
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 06-21-2016 - 5-i - Authorization to Award the Bid and Contract for Construction of the Fairview Park Parking Expansion Project
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2016\Agenda - 06-21-2016 - Regular Mtg.
R 2016-398-E DEAPR - McQueen Construction, Inc. for Fairview parking expansion - 6-21-2016, Item 5-i
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2E5A8509-E4CD-4A45-9241-C69B05F6A27D <br /> 25 <br /> 7.29 All Work performed pursuant to the Contract Documents shall conform in all respects to the <br /> North Carolina State Building Code and all other state, local, and national codes in effect at the <br /> time of and applicable to this Work. <br /> 7.30 The Contractor shall provide for and maintain necessary safety measures and safety <br /> programs for the protection of all persons at the Project site, and shall comply at all times with <br /> the requirements of the most current edition of the CAGC Safety and Health Manual [or the <br /> AGC Accident Prevention Manual in Construction], or the equivalent requirements of the <br /> Contractor's safety program, and shall fully comply with all Federal, State, and local laws, rules, <br /> regulations, and building code requirements so as to prevent accidents or injuries to persons on <br /> or about the Project site. The Contractor shall clearly mark or post signs warning of existing <br /> hazards, and shall barricade excavations, elevator shafts, stairways, and similar hazards. The <br /> Contractor shall protect against damage or injury resulting from falling materials, and shall <br /> maintain all protective devices and signs throughout the progress of the Work. <br /> 7.31 The Contractor shall adhere to the rules, regulations, and interpretations of the North <br /> Carolina Department of Labor's Occupational Safety and Health Standards for the Construction <br /> Industry (29 CFR Part 1926 as adopted in 13 NCAC 07F.0201, including 29 CFR Part 1910 <br /> General Industry Safety and Health Standards applicable to construction) and N.C. Gen. Stat. <br /> §95-126 through 155 (Occupational Safety and Health) as well as all revisions and amendments <br /> to such standards or statutes as may occur throughout the performance of the Work. <br /> 7.32 Any land disturbing activity performed by the Contractor in connection with the Project shall <br /> comply with all erosion control measures set forth in the Contract Documents and any additional <br /> measures which may be required in order to ensure that the Project is in full compliance with the <br /> Sedimentation Pollution Control Act of 1973, as implemented by Title 15 North Carolina <br /> administrative Code, Chapter 4, Sedimentation Control, Subchapters 4A, 4B and 4C, as <br /> amended (15 NCAC 4A, 4B, and 4C), and as may be revised or amended in the future. Upon <br /> receipt of notice that a land-disturbing activity is in violation of said Act, the Contractor shall be <br /> responsible for ensuring that all steps or actions necessary to bring the Project in compliance <br /> with said Act are promptly taken. The Contractor shall be responsible for all penalties assessed <br /> pursuant to N.C. Gen. Stat. 113A-64 with respect to its Work, and shall indemnify and hold <br /> harmless the Owner from all costs and expenses, including attorney's fees and costs of defense <br /> arising out of or related to the enforcement of the Act against any party or person described in <br /> this Article. <br /> 7.33 Any mechanical or electrical work such as sleeves, inserts, chases, etc. located in the <br /> Work of the Contractor for general work shall be built in by that Contractor. On multiple prime <br /> projects, the mechanical and electrical contractors shall set all sleeves, inserts, and other <br /> devices built into the structure in cooperation and under the supervision of the Contractor for <br /> general work. The responsibility for exact location of such items shall be that of the mechanical, <br /> plumbing, or electrical prime contractor. <br /> 7.34 The Contractor shall be responsible for permanently fixed service facilities and systems in <br /> use during progress of the Work and shall strictly adhere to the following procedures: <br /> a) Prior to acceptance of the Work by the Owner, the Contractor shall remove and replace any <br /> part of the permanent building systems damaged through use during construction. <br /> Revised 6/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.