Orange County NC Website
1-26-07; 2:52PM;Ch. Hill / Carrboro <br />CHAPEL HILL - CARRBORO CITY SCHOOLS <br />ELEMENTARY SCHOOL #10 OPENING IN 2008-09 <br />PROJECT BUDGET MODEL <br />John Link <br />January 2007 <br />Budget Update <br />Budget Category Budget Model after Construction BIDS <br />Site Acquisition - <br />;919 969 2474 <br />9 <br />Variance/Notes <br />Construction: 15,429,159 20,191,323 Total Muld Prime Bids <br />On-Site Development: 1,542,916 included in bids included in bids <br />Off-Site Development: <br />Water and Sewer <br />Tum Lanes, Traffic Signal, NO 86 Improvements <br />Roundabout and Connector Road <br /># 6/ 12 <br />1,000,000 735,000 Blackmon Bid plus extras <br />500,000 500,000' maintain allowance-to be determined <br />500,000 included in bids Included in bids <br />Con. +.Dev. Sub-total 18,972,075 21,426,323 <br />Construction Development Fees <br />(inBtaV Included In Professional/Development Fees) <br />199,000 included in bids . OWASA Meters/Building permit <br />--VE Reductions (674,819) <br />Sub-Total <br />19,171,075 20,751,504 <br />Professional/Development Fees: 1,432,698 1,432,598 <br />Furniture and Equipment: 540,021 540,000 <br />3.5% of construction cost <br />Technology. <br />744,389 <br />744,389 <br />$8.25 per sf <br />Non-personnel Start Up Costs <br />500,000 <br />500,000 <br />Conlin ency* 569,162 622,545 <br />3.00% of constructionfalte development <br />Sales Tax Refunds <br />(350,000) <br />Sub-total $ 22,957,245 24,241,036 <br />Special Orange County Contribution for Utliftles/Roads $ (1,000,000) (1,000,000) <br />Project Budget $ 21,957,245 23,241,036 1,283,791 5.8%