Orange County NC Website
?-<w-ur r L.a<rnnr 4??- ni i ? i ?..a? ? vui u vunn ?.?nn r??? owa <-rr-r <br />S <br />CHAPEL HILL-CARRBORO CITY SCHOOLS <br />ELEMENTARY SCHOOL #10 <br />Value Engineering Analysis and Project Scope Modifications <br />of the Multi Prime Construction Bids <br />Description of Work <br />Cost Effect <br />Sustainable Features: <br />Remove solar panels. from roof (25,500) <br />Remove Solar Hot Water Heating Systetn' (15,000) <br /> <br />Building Modifications: <br />Delete vinyl wallcovering and paint walls (26,000)_ <br />Remove exterior split block and use brick (94,250) <br />Delete all exterior masonry bench seats (79,000) <br />HVAC-modify coverings on exposed piping (9,500) <br />HVAC-modify AHU from freeze scat to auto shut off . (4,500) <br />Modifv light fixtures from 4" deep to 3" deep (3;000) <br />Delete main entrance structure (661301) <br />Delete gymnasium entrance structure (24,718) <br />Delete canopies at 2/3 and 415 classroom wings (165,000) <br />Site Changes: <br />.Remove masonry veneer on-north and south retaining walls - (222,472) <br />Sub-total (735,241) <br />Additions per Town of Carrboro CUP Conditions: <br />Add bicycle rack cover per Town of Carrboro - 54,000 <br />Extend walkway in dumpster area per Town of Carrboro 6,422 <br />TOTAL (674,819)