Orange County NC Website
14. That prior to construction plan approval, general information about the typical hours of o loon for the <br />light fixtures be included on the plans. This information should disclose whether the lights will be <br />manually-controlled or placed on automatic timers. <br />15. That the applicant submit an application for annexation of the school property to the Town, prior to <br />occupancy of the school. <br />16. That prior to the construction plan approval layout details for the basketball court and specific <br />playground equipment details be shown on the plans. <br />17. That prior to issuance of the certificate of occupancy, the school district work with Town Police and Fire <br />staff to develop a traffic management plan to be put in place during peak use events at the school. <br />18. That the Board accepts the applicant's justification for exceeding the presumptive parking standards of <br />Section 15-291 by providing 102 spaces. As represented in the applicant's letter, this deviation is <br />justified because of the school district's experience with Rashkis elementary school (which is the <br />prototype for Elementary School #10) and because it better serves the parking needs of elementary <br />school programs which include substantial parental participation. <br />19. That the sidewalk / greenway trail beginning at the southern property line and terminating at the bus <br />drop-off area exhibit compliance on the construction plans with the greenway-facilities specifications <br />identified in the AASHTO Guide for the Development of Bicycle Facilities and in the Town of Carrboro <br />Comprehensive Master Plan for Recreation and Parks. <br />20. That prior to construction plan approval the applicant must provide staff with a copy of written <br />correspondence with appropriate agencies acknowledging that any disturbances are included in the total <br />wetlands impacts information provided for the project, including the proposed sanitary sewer extension. <br />21. That the planting plans not include any of the invasive species listed in Appendix 3 of the Land Use <br />Ordinance and that the planting plan for the stormwater devices and the "constructed drainage" be <br />further reviewed for plant species suitability for the intended function of the device and that the <br />approved construction plans include planting plans indicating the precise breakdown and type of trees, <br />woody shrubs, and herbaceous plants in each bioretention area and around and in each vehicle <br />accommodation area. <br />22. That prior to construction plan approval, the tree planting detail be replaced with the Town of Chapel <br />. Hill, December 2006 Tree Planting Detail. <br />23. That prior to approval of the construction plans, the applicant further modify the step-by-step, narrative <br />erosion control construction sequence such that the Environmental Planner can determine that erosion <br />and sedimentation risks to downstream water bodies have been minimized through careful planning and <br />staging of the construction of the "enhanced drainage way," removal of the large sediment basin, and <br />construction of the southern retaining wall. <br />24. That all of the project's state and federal notification, permit, and flood hazard area mapping <br />requirements be satisfied prior to construction plan authorization. <br />25. That the sidewalk that passes in front of the dumpster area adjacent to the bus loading area be extended <br />out to the connector road along the southern edge of the bus loading area and driveway. <br />26. That prior to construction plan approval, any easement associated with a cross-pipe located under a public <br />right-of-way be labeled "Public". <br />Carrboro Board of Aldermen Paae 6 Januarv 9. 2007