Orange County NC Website
1I <br />CHAPEL HILL CARRBORO CITY SCHOOLS <br />ELEMENTARY SCHOOL #10 <br />Value Engineering Analysis and Project Scope 'Modifications <br />of the Multi Prime Construction Bids <br />Cost Effect <br />Description of Work . <br />Sustainable Features: _ <br />Remove solar anels from roof <br />in S stem <br />Remove Solar Hot Water Heat <br />Building Modifications: 26,000 <br />111, Delete vin I wailcoverin arid alnt walls 94,250 <br />Remove exteriors lit block and use brick 79,000 <br />Delete all exterior mason bench seats 9,500 <br />HVAC-modi coverin son ex osed ! in 4,500 <br />HVAC-modi AHU from freeze stat to auto shut off <br />00 <br />linht fivtl trAS frOM 4° deep to 3" deep (3,001 <br />Delete main eniranUU *L1 uLLui <br />Delete gyrrinasiurn entrance sti <br />nt 9/3 and 4/5 <br />Site Changes: <br />Remove masonry veneer on <br />Additions per Town of Carrboro CUP <br />e <br />r Town of Carorboroons: <br />Add bic cle rack co <br />Extend walkwa?+ in dumpster area per Town of C <br />1 <br />1 <br />Sub-total (694,741) <br />54,000 <br />6,,422 <br />(634,319) <br />TOTAL