Orange County NC Website
CHAPEL HILL - CARRBORO CITY SCHOOLS <br />ELEMENTARY SCHOOL #10 OPENING IN 2008-09 <br />PROJECT BUDGET MODEL <br />Budget Category <br />January 2007 <br />Budget Update <br />Budget Model aker Construction BIDS <br />Site Ac uisition <br />Varianc_e/Notes <br />Multi <br />17 <br />On-Site Develo ment: 1,542,916 included in bids included In bids <br />Off-Site Development: <br />Water and Sewer <br />Turn Lanes, Traffic Signal, NC 96 improvements <br />Roundabout and Connector Road <br />1,000,000 735,000 <br />500,000 500,000 <br />500,000 included in bids <br />Blackmon Bid plus extras <br />maintain allowance-to be determined <br />included In bids <br />Con. -P Dev. Sub total 18,972,075 21,426,323 <br />Construction Development Fees 199,000 included in bids OWASA Meters/Building Permit <br />Qnitiatiy included in Professionawavelopment Fees) <br />VE Reductions 634,319 <br />Sub-Total 19,171,075 20,792,004 <br />. <br /> <br />s: <br />Professional/Development Fee <br />1432,598 <br />, <br />1,432,598 <br />Furniture and E ui ment: 540,021 540,000 <br />, <br />3.5% of construction cost <br /> 744,389 744,389 <br />Technolo <br />$9.25 per st <br />Non-personnel Start U Costs <br />500,000 <br />5ao,ooo <br /> 569,162 623,760 <br />Contingency: <br />3.o% of construction/site development <br /> 350,000 <br />Sales Tax Refunds <br />Sub-total <br />Special Orange County Contribution for Utilities/RoadS <br />09/2712007 Capital Project ordinance For Planning <br />Project Budget <br />$ - 2i,957,22!45 24,282,751 <br />$ (1,000,000) (1,000,000) <br />$ (900,000) (900,000) <br />$ 21,057,245 22,382,751 <br />1,325,506 6.3%.