Orange County NC Website
SCHEDULE A <br /> Item 1. $200/week <br /> Visit and maintain the system's pump stations(currently Brookhollow and Richmond Hills)on at <br /> least a weekly basis to perform routine inspection and maintenance, including but not <br /> necessarily limited to the following: <br /> a. Record pump run times since last visit and record any discrepancies <br /> b. Check operation of float switches,check alarm float,clean floats, if necessary <br /> c. Exercise backup generator,check power transfer switch operation <br /> d. Visually inspect generator fuel level <br /> e. Visually inspect pump station site <br /> f. Visually inspect wetwell and clean/remove grease if necessary <br /> g. Send monthly reports of activity and inspection records to the engineering division of <br /> the Orange County Planning Department. <br /> h. Notify Orange County in the case of any issue noticed during inspection that requires <br /> maintenance or repair above and beyond the normal duties <br /> Item 2. <br /> For any work that must be done which cannot be adequately addressed by the attached fee <br /> schedule,the City of Mebane will provide a cost estimate for the work and submit to the County <br /> prior to commencement of work, unless the work is of an emergency nature and must be done <br /> immediately in the interest of public health and safety. <br /> All additional work except emergency work will be preapproved by the County and billed in <br /> accordance with this schedule as outlined in section 4. <br /> COMAGREEMENT11514 <br />