Browse
Search
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 4:07:29 PM
Creation date
7/14/2016 4:16:35 PM
Metadata
Fields
Template:
BOCC
Date
7/14/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$80,774.00
Document Relationships
R 2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. for upgrade skills development HVAC
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 <br /> WA ': ':EN - HAY <br /> Mechanical Contractors Inc. <br /> Heating and Air Conditioning <br /> P.O.Box 818 •Hillsborough,NC 27278 <br /> 919-732-4362 <br /> May 27,2016/June 23,2016 <br /> Orange County <br /> RE: 503 W Franklin Street,Chapel Hill <br /> PROPOSAL <br /> We hereby submit specifications and estimates for: As noted: <br /> • Replace Split systems 1,2,3,4,5,6&7 with new equipment utilizing 95%gas furnaces with 14 <br /> Seer ratings. These systems will reconnect to existing ductwork,air distribution,venting,fresh <br /> air,power wiring&control wiring.All systems to be placed back as close as possible to existing <br /> location,will need to field verify exact final placement due to restrictions and service access. Any <br /> sheet metal duct,venting or electrical,off sets,extensions,needed to reach final location(close to <br /> existing)is included. <br /> • Provide labor and material to flush existing refrigerant lines,Repair and replace torn or missing <br /> insulation.(Re-use Existing line sets) <br /> • Provide&install new Stand Alone programmable thermostats. <br /> 14.0 Seer Systems w/95%Gas furnaces. $80,774.00 <br /> Add Alternate for Carrier Comfort View controls 7 systems. <br /> • Provide &install(1)IVU, (7)Premier Link controllers, (7) Sensors,communication <br /> wiring&start-up. $18,250.00 <br /> We propose hereby to furnish material and labor: As noted Above <br /> • Internet data line for controls connection(by Orange County). <br /> • Controls will be installed on existing county owned Computer. <br /> Payment due (net 30) <br /> Acceptance: <br /> Total Approved: <br /> Date: <br /> Respectfully submitted by:Ron LaPann Commercial Division ron.lapann(ciwarren-hay.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.