Orange County NC Website
DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 <br /> Angel Barnes <br /> From: Ron LaPann <Ron.Lapann @warren-hay.com> <br /> Sent: Thursday, June 23, 2016 4:50 PM <br /> To: Angel Barnes <br /> Subject: RE: Skills Development HVAC Upgrade <br /> Attachments: 5.2016 Various Options Warren Hay Proposal.pdf; REVISED 7 Systems 6.2016 Controls <br /> Option Warren Hay Proposal.pdf <br /> Angel, <br /> Attached is a (REVISED) quote for ALL 7 Systems located here as discussed. <br /> I have removed the (New line sets and based this revised number on reconnecting to <br /> existing, flushing, leak check and repairing any missing insulation.) <br /> I have also removed the $2,200.00 Line item for roof work as it should not be needed. <br /> Original price for all (7) systems was <br /> $87,974.00 <br /> -$5,000.00 (New Line sets credit) <br /> -$2,200.00 (Roofing allowance) <br /> $80,774.00 for ALL Seven systems That is an increase over the original approval for (6) <br /> systems of $5,372.00. <br /> Hope this helps, let me know how to proceed, I need to secure equipment, and change <br /> permit to reflect 7 systems in lieu of 6 but other than that I don't anticpate any issues, we <br /> will reconnec to all existing as planned and new equipment should fit back as is. <br /> Keep in mind you may be required during inspeciton to install a fall protection gate/ <br /> rail where the existign access point is, depends on the inspector. <br /> I have attached both the original and revised proposal review and let me know if there are <br /> any quesitons or comments. <br /> Regards, <br /> Ron LaPann <br /> 1 <br />