Browse
Search
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 4:07:29 PM
Creation date
7/14/2016 4:16:35 PM
Metadata
Fields
Template:
BOCC
Date
7/14/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$80,774.00
Document Relationships
R 2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. for upgrade skills development HVAC
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 <br /> This Contractor shall maintain a set of prints, showing exact locations of all relocated equipment, <br /> concealed equipment, service accesses, dampers,underground lines, and all other changes to plans. <br /> This set shall be kept current and turned over to the Designer upon completion of the job. Show <br /> dimensions to locate all underground piping from permanent reference points. <br /> L. STANDARDS: <br /> All work performed and equipment furnished by this Contractor shall be in accordance with <br /> applicable standards as published by ASHRAE, ANSI,NFPA, SMACNA,ASME, and UL. <br /> M. INCIDENTAL CONSTRUCTION WORK: <br /> All blocking for openings, ducts and pipes in concrete floors,masonry walls or partitions shall be <br /> provided by this Contractor. This Contractor shall do all cutting and fittings of his work and of other <br /> work that may be required to make the several parts come together properly and to fit his work to <br /> receive or be received by the work of other Contractors as shown upon,or reasonably implied by the <br /> drawings and specifications. He shall properly complete and finish up his work after other <br /> Contractors have finished as the Designer may direct. <br /> All excavating required for the installation of this system shall be done by this Contractor and shall <br /> be unclassified; and backfill shall be accomplished as specified in appropriate section of <br /> specifications. Chases are prohibited in masonry walls which are not to be plastered or paneled. Set <br /> piping and ducts indicated to be concealed in unplastered or unpaneled masonry walls before walls <br /> are constructed in order that walls may be constructed around pipes or ducts. This Contractor shall <br /> furnish and install all sleeves in floor,beams,walls,etc.,for such penetration as needed for installing <br /> his work and installation by General Contractor. <br /> Unless otherwise noted,the General Contractor will provide openings and lintels as new construction <br /> progresses,but this Contractor shall fully designate his requirements prior to construction. Failure to <br /> furnish his requirements prior to building construction shall make this Contractor responsible for <br /> removing, replacing and painting building construction as required for installation of his work. <br /> N. CLEANING AND PAINTING: <br /> This Contractor shall at all times keep the Owner's premises,the adjoining premises,driveways and <br /> streets clean of rubbish caused by this Contractor's operations and at the completion of the work shall <br /> remove all the rubbish from and about the premises,all his tools,equipment temporary work,surplus <br /> material and shall leave the work clean and ready for use. <br /> This Contractor shall be required to perform touch-up painting on all factory finished equipment <br /> installed under this contract where necessary to repair abraded or scarred areas and make a clean and <br /> neat installation at the direction of the Designer. All metal exposed to weather shall be properly <br /> painted. <br /> 15H-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.