Browse
Search
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. - upgrade skills development HVAC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 4:07:29 PM
Creation date
7/14/2016 4:16:35 PM
Metadata
Fields
Template:
BOCC
Date
7/14/2016
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
Manager signed
Amount
$80,774.00
Document Relationships
R 2016-359-E AMS - Warren-Hay Mechanical Contractors, Inc. for upgrade skills development HVAC
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
View images
View plain text
DocuSign Envelope ID: E9612703-F25B-492D-9C8C-EC3F9728ECE6 <br /> [Departmental Use Only] <br /> TITLE Skills HVAC Upgrade <br /> FY 2015/16 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 7th day <br /> of July, 2016, by and between Warren-Hay Mechanical Contractors Inc., (hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request ,for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by N/A (Sheet N/A dated N/A) <br /> b. Written specifications prepared by the project engineer. <br /> c. Warren-Hay Mechanical Contractors Inc, proposal dated June 23, 2016, (for 14.0 Seer <br /> Systems with 95% Gas Furnaces), Titled: REVISED 7 Systems 6.2016 Controls Option <br /> Warren Hay Proposal (2).pdf. Specifications are included for reference only. This project <br /> is to change out (7) existing systems with new reconnecting to existing power, controls, <br /> duct system,refrigerant piping as noted (revised 7 systems proposal) which fully describes <br /> the work to be perfouued. Such work will hereafter be called the "Work". <br /> Revised 6/16 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).