Browse
Search
Agenda - 01-30-2007-2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-30-2007
>
Agenda - 01-30-2007-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:06:34 PM
Creation date
8/28/2008 11:17:00 AM
Metadata
Fields
Template:
BOCC
Date
1/30/2007
Document Type
Agenda
Agenda Item
2
Document Relationships
Minutes - 20070130
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y? <br />County Campus <br />After review of the recommendations for occupants of the downtown Hillsborough <br />County Campus and in anticipation of departmental reorganizations that I am <br />contemplating, I am recommending occupancy of the downtown county campus <br />buildings as follows: <br />Link Center: <br />Current Square Desired Square <br />Footage Footage <br />1,562 2570 <br />1,200 2900 <br />0 5000 <br />700 1,740 <br />1,000 2,350 <br />1,350 1,900 <br />This recommendation differs from the information presented during the November 9, <br />2006 worksession in the following manner: <br />• Personnel Department is being confirmed as an occupant of the Link Center. <br />• The BOCC meeting room is recommended for the Link Center. At this time, it is <br />not recommended for use as a performance center. The needs of performance <br />space are specific and are diametrically opposed to those of a public meeting <br />room. While the room can be designed to multi-task in several areas, use as <br />performance space is not recommended at this time. Should the Board indicate <br />an interest in doing so staff will assess options for the performance space that <br />may be available for this purpose. <br />• Final square footage allocations sufficient to meet departmental needs will be <br />finalized during departmental reorganization. <br />Gateway Building <br />Current Square Desired Square <br />Footage Footage <br />1,400 2,100 <br />3,500 3,500 <br />3,800 5,930 <br />5,263 7,620 <br />5
The URL can be used to link to this page
Your browser does not support the video tag.