Browse
Search
Agenda - 01-23-2007-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:13:28 AM
Creation date
8/28/2008 11:14:53 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q+ <br />Orange County Library Long-Runge Facility Planning <br />unlikely that space requirements will be substantially reduced by the electronic formats. <br />Space will still be required for the preservation of original valuable documents and materials <br />not easily digitized. <br />? That the Orange County Public Library combine the collections, staff, and services <br />presently located at McDougle Middle School and the Century Center, and establish <br />one branch library facility to serve the Town of Carrboro, western unincorporated <br />areas of the Chapel Hill Township, and the southern area of Bingham Township. It is <br />estimated that given the current 20 year population projections, a newly constructed <br />facility of 25,000 square, feet would be needed. <br />Residents of Carrboro have for many years depended on the Chapel Hill Public Library for <br />library service and have been seeking a more accessible public library facility. To respond to <br />these requests, the Orange County Public Library first opened a branch in the media center at <br />McDougle Middle School. More recently, with support from the Town of Carrboro, it has <br />added a Cybrary downtown to complement hours and services at the school. <br />Although the present facilities are innovative approaches to addressing critical needs for <br />library services, access and resources are limited. The public library at the Middle School <br />operates only during the hours school is not in session. The opening of the Cybrary is an <br />attempt to increase access and extend hours available, but staffing, collections, and services <br />are very limited. <br />The Carrboro Library Workgroup has recently recommended that a stand-alone branch <br />library of 6,000-8,000 square feet replace these two facilities.. As the Orange County Library <br />Task Force reviewed this situation with the consultant, it agreed that the need for service <br />extends beyond the town limits of Carrboro and determined that the design population for a <br />new facility should include the broader region of Southwest Orange County and discussed its <br />potential role as a regional branch library similar to those in Wake County. <br />As with the central library, the consultant developed a set of basic requirements for the <br />branch using the proposed design population (including 20-year projections for the broader <br />Southwest Orange population) and identified potential functions to be accommodated in the <br />facility. Appendix A itemizes these requirements and functions. Appendix F calculates the <br />proposed size of the facility based on the set of requirements and functions. The resulting <br />optimal size for a newly constructed facility is 25,000 square feet. <br />Alternatives to constructing a facility of this size immediately include the following: <br />¦ Leasing a smaller facility and moving to larger facilities as needs indicate <br />¦ Constructing a smaller facility but locating it on a site which has space for an <br />expanded facility <br />? That the Orange County Public Library establish a branch library to serve Cheeks <br />Torvnship, its size dependent on the tinting of the opening of the library and subsequent <br />changes in population projections for the toipnship. It is estimated that, given the <br />current 20 year population projections, a newly constructed facility of 10,000 square <br />17
The URL can be used to link to this page
Your browser does not support the video tag.