Browse
Search
Agenda - 01-23-2007-5t
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5t
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:20:40 AM
Creation date
8/28/2008 11:13:21 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5t
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S Park & Rec- Hillsborough Fairview Park, Co Parks Operations Base & Public Works Facilities - Land Swap
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 7? Ca.r q 4- Ai-c> rr, RQ J f -r Q 4 <br />Recommendations of the Committee c?a r` t. o o (Dlc-? <br />Note: In reviewing the master plan and the following recommendations, it may be useful <br />to think of the master plan for the site as having three sections, or "pods." The "southern <br />pod" includes the majority of proposed park facilities and would be accessed from Torain <br />Street or the connector trail (see below) - or for persons outside of the neighborhood, <br />from the NC 571 NC 86 intersection. The "western pod°is located adjacent to the existing <br />community policing station and is adjacent to Rainey Avenue. The eastern pod" <br />contains the County Public Works site and future Town Public Works site, along with <br />other planned future County facilities. The reason for the °pod" design approach is <br />explained in the rationale section on page 6. <br />After considering all of the above information and discussing the <br />possibilities, the Committee recommends the following actions as <br />facility improvements for Phase 2 of the park: <br />1. That the following facilities be constructed as Phase 2 of the <br />Fairview Park as the top priorities (as shown on the attached <br />Master Plan map on page 4). These facilities are listed in <br />priority order, with the understanding that some facilities may <br />need to be deferred based on available funds: <br />• Two hard-surface lighted basketball courts, located the <br />"southern pod." <br />• A full-size youth baseball/ softball field, located in the <br />southern part of the site. <br />• Two new playgrounds, one near the new ballfield in the <br />"southern pod," and a replacement playground in the <br />"western pod" near the existing structure and police <br />station. <br />• A picnic shelter with concessions bay (and possible <br />restrooms located near the new ballfield in the <br />"southern pod' <br />• Walking trails of approximately 1/2 mile in total, with a <br />main trail connection between the ballfield ("southern <br />pod") and the police station / playground ("western <br />pod"). There would also be a trail around the new <br />ballfield, with spur to the southern parking lot and Torain
The URL can be used to link to this page
Your browser does not support the video tag.