Browse
Search
Agenda - 06-21-2016 - 7-d - Addition of Wake County to the Renamed Triangle Tax District and Approval of the Wake County Transit Plan and Multiparty Interlocal Transit Agreement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 06-21-2016 - Regular Mtg.
>
Agenda - 06-21-2016 - 7-d - Addition of Wake County to the Renamed Triangle Tax District and Approval of the Wake County Transit Plan and Multiparty Interlocal Transit Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 10:05:10 AM
Creation date
6/17/2016 10:42:47 AM
Metadata
Fields
Template:
BOCC
Date
6/21/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7d
Document Relationships
2016-437 BOCC - Clerk to the Board Certification of Action of the OC BOCC - 6-21-16, Item 7-d
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
Minutes 06-21-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
74 <br /> Ansmav AnalIyals <br /> 47 <br /> Ea Motion or Proamlnary <br /> Locally Preferred <br /> Alternatives P <br /> 417 U <br /> We B <br /> Are ' Scoping L v.) <br /> Here <br /> Preliminary Engineering/ C <br /> Draft Environmental Impact <br /> Statement(PE/DEIS) <br /> --- ------- <br /> N <br /> �Fial Saloon=or V <br /> Locally Preferred <br /> Alternative O <br /> L <br /> Preliminary Engineering/ V <br /> Final Environmental Impact <br /> Statement E <br /> ____T M <br /> E <br /> Environmental m <br /> of Decision N <br /> T <br /> 1 <br /> Gortotruction <br /> Through the jointly adopted 2035 Long Range Transportation plan by the Durham-Chapel Hill- <br /> Carrboro MPO (DCHC MPO) and the Capital Area MPO (CAMPO),transportation corridors in <br /> greatest need of more detailed planning and analysis were identified. The Alternatives <br /> Analysis (AA), completed in 2011, focused on a set of needs and alternative actions to address <br /> these needs, and generated information needed to select an option for further engineering <br /> and implementation. In February 2012,the DCHC MPO selected a 17.3-mile light rail corridor <br /> from East Durham to UNC Hospitals as the locally preferred alternative(LPA). Triangle <br /> Transit, as the local project sponsor, will submit to FTA the New Starts project justification <br /> 9/27/2012-Page 127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.