Browse
Search
Agenda - 06-21-2016 - 7-d - Addition of Wake County to the Renamed Triangle Tax District and Approval of the Wake County Transit Plan and Multiparty Interlocal Transit Agreement
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2016
>
Agenda - 06-21-2016 - Regular Mtg.
>
Agenda - 06-21-2016 - 7-d - Addition of Wake County to the Renamed Triangle Tax District and Approval of the Wake County Transit Plan and Multiparty Interlocal Transit Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 10:05:10 AM
Creation date
6/17/2016 10:42:47 AM
Metadata
Fields
Template:
BOCC
Date
6/21/2016
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7d
Document Relationships
2016-437 BOCC - Clerk to the Board Certification of Action of the OC BOCC - 6-21-16, Item 7-d
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
Minutes 06-21-2016
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br /> Durham County Bus Transit Plan -- Small Capital Costs (excluding buses) <br /> Complements Express rail to TMC and Light Rail to Leigh Village <br /> CAPITAL PROJECTS RELATED OPERATING PROJECT Unit Cost Quantity Est.Cost <br /> Park-and-Ride lot in northern Durham County Rougemont-Duke-Downtown Express $350,000 per lot 1 $350,000' <br /> Rougemont-Duke-Downtown Express AND Durham <br /> Park-and-Ride lot near Durham Regional Hospital Regional-Duke Medical Hospital Connector $350,000',per lot 2 $700,000' <br /> Associated <br /> Chapel Hill-Durham Express(Route 405)-peak only with Light <br /> Park-and-Ride lots at Patterson Place and/or South Square AND New Hope Commons-Downtown via Duke Rail Project <br /> Southpoint-Duke Connector AND Chapel Hill- <br /> Regional Transit Center via Southpoint(Route 800)- <br /> Park-and-Ride near Southpoint Mall peak only $350,000,per lot 2 $700,000' <br /> Chapel Hill-Regional Transit Center via Woodcroft <br /> Park-and-Ride near Woodcroft Shopping Center (Route 805) $350,000',per lot 1' $350,000' <br /> Transit Emphasis Corridor(Holloway St between The Village <br /> and Alston Ave) The Village-Downtown (Route 3)-peak only $530,000 per mile 2' $1,060,000' <br /> Transit Emphasis Corridor(Roxboro Rd between 1-85 and <br /> Durham Regional Hospital) Durham Regional-Downtown (Route 4) $530,000 per mile 3' $1,590,000' <br /> Transit Emphasis Corridor(Fayetteville St between Lakewood <br /> and Cornwallis) NCCU-Downtown(Route 5) $530,000',per mile 4' $2,120,000' <br /> Neighborhood Transit Center(Northern Durham) Durham Regional-Downtown (Route 4) $220,000 per bay 3 $660,000' <br /> The Village-Downtown (Route 3)-peak only AND <br /> Neighborhood Transit Center(The Village) Southern High-Downtown (Route 16) $220,000',per bay 3' $660,000' <br /> Southpoint-Duke Connector AND Chapel Hill- <br /> Neighborhood Transit Center(Southern Durham) Regional Transit Center via Southpoint(Route 800) $220,000 per bay 3' $660,000' <br /> Chapel Hill-Durham Express(Route 405)AND New <br /> Neighborhood Transit Center(1-40/US 15-501) Hope Commons-Downtown via Duke $220,000 per bay 2' $440,000' <br /> Pedestrian Accessibility/Amenities Improvements Top 200 Boarding Locations $10,000 Per stop 200 $2,000,000' <br /> Subtotal $11,300,000' <br /> Contingency 30% $3,400,000' <br /> Total $15,000,000' <br />
The URL can be used to link to this page
Your browser does not support the video tag.