Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Rosemary & Elliott Williams <br />Address: 2607 Overland Passage <br />City: Chapel Hill, N.C. 27516 <br />Phone: (919) 370-3552 <br />Date: November 8, 2006 <br />Master Bathroom: <br />5. Install a center face-plate on the bathroom vanity. Match the finish <br />as close as possible. Attach from interior of vanity. <br />6. Install two (2) stainless steel grab bars on both side walls around <br />the handicap commode. Install 1x6 painted trim screwed to the side <br />wails and attach the grab bars to solid wood trim. Note: One end <br />of grab bar should be screwed through 1x6 and into wall studs. <br />Consult homeowner for proper grab bar height. _ <br />2ND Floor Bathroom: <br />Page 5 <br />1. Remove the wall mirror and all wall paper from the walls. Clean the <br />walls with a mild cleaner. Remove all wall paper glue and prepare for <br />primer. Prime the walls with a kilz type primer. <br />Reinstall mirror when all painting is complete. <br />2. Prepare the floor for new vinyl. Install %" lauan plywood and a new <br />vinyl floor. The vinyl to cost not less than $ 14.00 sq.yard. Install <br />metal trim at door opening. Install new shoe molding at all wall and <br />cabinet areas. Prime new shoe molding with an oil primer. Paint shoe <br />molding with semi-gloss latex paint. Caulk vinyl at tub using white <br />silicone caulk. <br />Staircase: <br />1. Repair loose handrail. Install all missing hardware and secure <br />to wall. <br />Plumbing: <br />Install a new double bowl stainless steel sink in the kitchen. Install <br />new strainers, drain line assembly/p-trap, supply lines and new <br />cut-offs. Make all plumbing connections. <br />2. Install a new single lever faucet on the kitchen sink. Note: Faucet <br />shall be a Delta or pre-approved equal. Make all plumbing <br />connections.
The URL can be used to link to this page
Your browser does not support the video tag.