Browse
Search
Agenda - 01-23-2007-5r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 01-23-2007
>
Agenda - 01-23-2007-5r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:21:47 AM
Creation date
8/28/2008 11:13:03 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2007
Document Type
Agenda
Agenda Item
5r
Document Relationships
Minutes - 20070123
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Rosemary & Elliott Williams Page 4 <br />Address: 2607 Overland Passage <br />City: Chapel Hill, N.C. 27516 <br />Phone: (919) 370-3552 <br />Date: November 8, 2006 <br />Kitchen: <br />3. Install new rolled back formica countertops. The new countertops to match <br />cabinet layout. Note: Consult homeowner to choose color. New countertops <br />shall be installed correctly. All joints shall be tight to prevent water <br />intrusion. <br />4. Prepare the floor for lauan plywood and a new vinyl floor. Clean <br />floor by removing all dirt and debris. Install Y4" lauan plywood and <br />a new vinyl floor. The vinyl to cost not less than $ 14.00 sq. yd. <br />Install a metal strip at closet door and where vinyl meets all carpet. <br />5. histall shoe molding at all wall and cabinet areas. Finish shoe <br />molding to match cabinet finish. <br />Master Bathroom: <br />1. Remove existing shoe molding. Install V4" lauan plywood and a <br />new vinyl floor. The vinyl to cost not less than $ 14.00 sq. yard. <br />Install metal trim at all door openings. Install new shoe molding <br />at all wall and cabinet areas. Prime and paint shoe molding. Prime <br />shoe molding with an oil primer. Paint shoe molding with <br />semi-gloss latex paint. <br />2. Install a five piece accessory kit in the master bathroom. Accessory <br />kit to include two, twenty four (24) inch towel bars, a soap dish, <br />tumbler holder, and paper holder. Note: Homeowner to choose finish. <br />( Chrome, brass, wood etc.) _ <br />3. histall a new mirror of matching size in the master bathroom over <br />the vanity. Install a new section of mirror trim ( mirror sits in) <br />along top edge of vanity. Install proper fasteners at both top corners <br />into wall. <br />4. Install a molded marble vanity top/sink in the master bathroom. <br />Note: Contractor to verify correct length. Install a single lever <br />faucet, new drain line assembly/p-trap, supply lines and cut-offs. <br />Make all plumbing connections. Note: New faucet shall be a Delta <br />or pre-approved equal.
The URL can be used to link to this page
Your browser does not support the video tag.